Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage BarrierBy A. David Miller, Douglas M. Barber
"The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust
Jan 1, 2015
-
Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs
Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS
Jan 1, 2019
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Geophysical Subsurface Characterization to Estimate Top-Of-Rock Elevation for Deep Foundations in Challenging Geologic Settings: Numerical Investigation of Full Waveform TomographyBy Siavash Mahvelati, Alireza Kordjazi, Joseph Thomas Coe
Deep foundations are often constructed as end bearing members with a significant amount of their capacity derived from bedrock. Sites with highly variable bedrock conditions therefore present a uniq
Sep 8, 2021
-
Geophysical Subsurface Characterization To Estimate Top-Ofrock Elevation For Deep Foundations In Challenging Geologic Settings: Numerical Investigation Of Full Waveform TomographyBy Siavash Mahvelati, Alireza Kordjazi, Joseph Thomas Coe
Deep foundations are often constructed as end bearing members with a significant amount of their capacity derived from bedrock. Sites with highly variable bedrock conditions therefore present a unique
Oct 1, 2021
-
Ethical and Risk Aspects of Deep Foundation SubcontractsBy Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
Verification Of Drilled Shaft Resistance By The Post Grouting MethodBy Suthan Pooranampillai
Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c
Jan 1, 2010
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODSBy Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers
Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Anchored Double-Tier Retaining Walls on Sloping EmbankmentBy Chu E. Ho, Paul Napoli
A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia
Jan 1, 2019
-
Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, LondonBy Shields H. Arup
The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi
May 1, 2022
-
A Case Study, Design Change from Spread Footing to Drilled ShaftsBy Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Diving Underground - Through a Hologram - To Better Understand Foundation RiskBy Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols
Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm
Jan 1, 2019
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022