Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge TestBy Chengcan Wang, Jin-Tae Han, Young-Eun Jang
"The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key
Jan 1, 2016
-
Special Aspects of Constructions with Deep Mixing Systems for InfrastructuresBy Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip
"A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc
Jan 1, 2015
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) MethodBy Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
Design of the Lift-in Dam at Olmsted on the Ohio RiverBy Dale E. Berner
A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo
May 11, 2007
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Sustainability and the Future for the Deep Foundations IndustryBy Tony Suckling
"As we head toward the United Nations Climate Change Conference in Copenhagen in December, the environment and sustainability will become headline news for a while. Governments are expected to agree t
Jan 1, 2009
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity PilesBy W. G. K. Fleming
Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m
Jan 1, 1991
-
Non-Braced And Non-Anchored Diaphragm Walling In Soft Soil ? SynopsisBy D. Y. Peng
A Large Sub-structure with open top of S.Y.P. float line requires a 90m x 50m in plan and 13m-deep excavation in soft soil, Shanghai. The geological conditions in site are rather severe. The technolog
Jan 1, 2010
-
You Can't Drive Piles Because Of The VibrationBy Jerry A. Steding
How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he
Jan 1, 1988
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015