Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Private Regulatory Fragmentation As Public Policy: Governance In Canada?s Mining Industry (DRAFT / ABRIDGED VERSION)

    By José Carlos Marques

    This paper addresses recent calls to study the role of the state in private regulation. Using an historical, organizational-field approach, I trace and explain the evolution of public debates and inte

    Aug 1, 2013

  • CIM
    Elliptical Shafts

    By Charles Graham

    For hundreds of years the standard vertical mine shaft was rectangular shaped and timber lined. There are many advantages to rectangular shafts but as mines became deeper the circular shaft became mor

    Feb 1, 2008

  • CIM
    The Impact of Heap Operational Changes on the Copper Production at Zaldivar

    By S. C. Bouffard

    Barrick's Zaldivar operation in Chile produces copper by heap leaching, solvent extraction, and electrowinning. The heap consists of a dynamic pad, and its stacking and operating conditions have

    Jan 1, 2007

  • CIM
    Kinross Paracatu, Start-Up and Optimization of SAG Circuit (7832025f-e075-4ccb-ad3a-7f076b2a98ce)

    By Jr. Santos, T. V. Pignaton, R. B. Gomides, W. Phillips, M. P. D. Gomes

    Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several

    Jan 1, 2012

  • CIM
    Cyclones at East Malartic Mines Ltd.

    By J. W. Keyes

    "The original grinding circuit at East Malartic consisted of two 8 by 8 C.A.C. mills in closed circuit with two 72 inch Akins Classifiers and an 8 by 10 secondary mill in closed circuit with two 48 in

    Jan 1, 1964

  • CIM
    Oxygen reduction kinetics at sol-gel derived LSM/YSZ cathodes (089bb2de-45e6-4a46-81ff-eaa3b66bfd9d)

    By J. Fournier

    A novel sol ? gel (SG) synthesis procedure utilizing varying ratios of glycine and ethylene glycol to total metal cations has been developed to create high purity nanometer sized La0.65Sr3.5MnO3 powde

    Jan 1, 2005

  • CIM
    The Use of Vegetation to Stabilize Mine Tailings Areas at Copper Cliff

    By C. A. Young

    "The stabilization of tailings has been a matter of concern to the Mining Industry for many years. In earlier times, when mines were small and only high grade ore deposits were mined, the problem was

    Jan 1, 1969

  • CIM
    Fluid-inclusion Data for Vein-type Cu-Ni-PGE Footwall Ores, Sudbury Igneous Complex and Their Use in Establishing an Exploration Model for Hydrothermal PGE-enrichment Around Mafic-Ultramafic Intrusions

    By Ferenc Molnár, David H. Watkinson

    Abstract - Cu-Ni-PGE footwall ore deposits were studied in the McCreedy East and Whistle mines along the North Range, and the Lindsley and Little Stobie mines along the South Range of the Sudbury Igne

    Jan 1, 2001

  • CIM
    High Current Density Operation at Toyo Tank House

    By M. Takebayashi, K. Takenaka, S. Matsubara, T. Yoneyama

    The cathode production of Toyo Smelter and Refinery, owned by Sumitomo Metal Mining Co., Ltd. reached 450,000 tons per year in 2016 with three tank houses. Niihama tank house commenced operations in 1

    Jan 1, 2019

  • CIM
    Underground incentives - their development, application and effect at Brunswick No. 12 mine, Bathurst, New Brunswick

    By Robert W. Baker

    "Brunswick Mining and Smelting commenced production at the No. 12orebody, a lead/zinc/copper/silver deposit, situated some seventeen miles southwest of Bathurst, New Brunswick, in 1964 at 4100 tonnes

    Jan 1, 1995

  • CIM
    Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern Ontario (62c7f132-cf18-4360-a616-5b6ce67e7217)

    By M. B. McClenaghan

    "The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to aid mineral

    Jan 1, 1994

  • CIM
    Les ressources Québécoises en silice

    By Henri-Louis Jacob

    Le Québec dispose de ressources en silice abondantes et diversifiées, pouvant convenir dans l'ensemble à la plupart des usages industriels. Dans les terrains Paléozoïques des BassesTerres du Saint-Lau

    Jan 1, 2001

  • CIM
    Senior Professionals Where did they Go?

    UBC Mining Department As an example ?35 Graduating ?14 with Jobs ?6 with Strong leads ?149 Undergraduate ?Projecting 43 second year students ?10-30 % Dual Degree

    May 1, 2010

  • CIM
    A Blast from the Past ? The Granduc Tunnel

    By V. Evans

    Mine lateral development advance rates currently average about 5 metres (16.5 ft.) per day. Granduc Tunnel hit 35.1 metres (115 ft.) on their best day, 12 km from the portal, single heading forty-thre

    May 1, 2011

  • CIM
    Session theme: How dead do you want it? Unborn, troublesome or healthy mines: The Economic and Strategic Effects of Mine Closure

    By Philip Peck

    Mine closure issues ?Narrow issues: ?Environmental focus; ?Broad issues: ?Social issues and sustainability; ?Continued importance of mining; ?Historical legacies from closed mines; ?Barriers

    May 1, 2006

  • CIM
    High Grade Flotation of Copper Concentrates at Est Malarctic

    By George Hope, Dave Green, Jacques McMullen

    The Est Malartic mill has been treating massive sulphide, copper/gold ore from the Bousquet 2 mine since 1989. The need to minimize copper content in flotation tails which are leached for gold recover

    Jan 1, 1994

  • CIM
    Stable Isotope Study of Variscan Vein Pb-Zn-Ag Mineralization of the Bohemian Massif (63085097-dc47-4544-8d70-a367fa184777)

    By J. H. Bernard, K. Žák

    The three traditional types of Variscan vein Pb-Zn-(Ag) mineralization recognized in the Bohemian massif from historic paragenetic studies are confinned by modem metallogenic studies. Stable C, S, and

    Jan 1, 1992

  • CIM
    Regulatory Approvals for Major Capital Projects -A Better Way-

    By Terry Bachynski

    _ Regulatory Process _ Approval Timelines _ Trends _ Stakeholder Consultation Expectation _ Challenges _ Initiatives for Regulatory Process Reform _ A Better Way? Alberta Regulatory Process _

    May 1, 2004

  • CIM
    How Improvements in Underground Block Caving Methods and Costs have impacted the Final Open Pit Definition

    By Sergio Fuentes

    During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs. This paper describes improvements in mine design, mine p

    May 1, 2003

  • CIM
    Reduce the Life Cycle Cost through application of Reliability Centered Maintenance Case Study on a Mining Shovel

    Presentation Agenda ?Background ?OEM Recommendations before RCM ?Operating Context ?OEM Recommendations after RCM ?Reality of Failure ?RCM Deliverables ?Maintenance program optimization ?Spar

    May 1, 2010