Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study of interaction zone between aluminum and alumina under static and dynamic flow conditions

    By Y. Kocaefe, S. Afshar, D. Kocaefe, Z. Kunt, C. Allaire

    Interaction of aluminum with silica based ceramics Jose M. Soto, Jeffrey D. Smith, William G. Fahrenholtz. Department of Ceramic Engineering University of Missouri-Rolla Rolla, MO 65409-0330 USA ABSTR

    Jan 1, 2004

  • CIM
    Geochemical Characteristics of the Paleozoic Sedimentary Rocks in the Winnemucca Quadrangle, Nevada, U.S.A.-Background Values for Gold Exploration

    By L. C. Hsu, H. F. Jr. Bonham, M. O. Desilets, P. J. Lechler, J. G. Price, L. J. Garside

    Abstract-Geochemical background levels have been established for unmineralized sedimentary rocks that are elsewhere the hosts of Carlin-type gold deposits in the Getchell Trend. The Paleozoic rocks in

    Jan 1, 1995

  • CIM
    Surface Interaction between Biopolymers as Bioflocculants and Clay Minerals in Mining Tailings

    By N. Molaei, E. R. Bobicki

    The continued demand for mineral products, coupled with the depletion of high-grade ore resources, has led to the mining of lower grade ores, which often require fine grinding to achieve mineral liber

    Jan 1, 2019

  • CIM
    Essais en réservoir (« tank tests ») sur les stériles de la mine Tio

    By Benoît Plante

    La mine Tio (QIT Fer et Titane Inc.) exploite à ciel ouvert un gisement d?ilménite massive depuis 1950, générant jusqu?à maintenant plus de 70 Mt de roches stériles potentiellement génératrices de dra

    Nov 1, 2008

  • CIM
    The Star Key Mine

    By T. Patching

    "MINING operations at the Star Key Mine provided an example of a small-scale prairie-type coal mine that employed several interesting procedures and achieved good productivity with low capital expendi

    Jan 1, 1985

  • CIM
    La Silice de Charlevoix

    By Jehan Rondot

    Des quartzites très pars ont été dêcouverts au cours de la cartographie de la region du lac des Martres, étape de l'étude géologique de la region de Charlevoix. On distingue quatre groupes métas

    Jan 1, 1977

  • CIM
    Influence de la composition minéralogique du minerai sur les performances des procédés de broyage et de flottation au concentrateur n0 1 de Mines Gaspé (Murdocbville, Québec)

    By M. A. Bérubé

    Le but principal de cette étude était de vérifier certaines hypothèses de nature minéralogique susceptibles d'expliquer en tout ou en partie les variations importantes observées au concentrateur

    Jan 1, 1984

  • CIM
    Economic Analysis of Pit Slope Design

    By Young C. Kim

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risk of slope failure inherent in steeper slope angles. However, no formal framework fo

    Jan 1, 1979

  • CIM
    Tankhouse modernization at CCR

    By J. Thiriar

    The electrolytic tan/chouse at CCR was recognized by management as lagging behind modem refineries in terms of productivity, energy efficiency and controls. The operation was also burdened by high mai

    Jun 1, 1993

  • CIM
    Modelling load and product distribution in autogenous and semi-autogenous mills: Pilot plant tests

    By Frédéric Flament, Mary Goldman, Gille Barbery

    "Pilot plant testwork on autogenous and semi-autogenous grinding was conducted at the Centre des Recherches Minérales du Québec (CRM) to investigate the effect of ball addition, solids concentration i

    Jan 1, 1991

  • CIM
    Laboratory and pilot-plant beneficiation of chromite ore from Bird River, Manitoba (1247a540-347d-460b-96be-84ffa86f2377)

    By P. R. A. Andrews, I. Jackman

    "A mineral processing investigation to recover chromite was performed at Lakefield Research, under the guidance of CANMET personnel, on a 70 tonne ore sample from the Bird River deposit in Manitoba. I

    Jan 1, 1988

  • CIM
    Laboratory and pilot-plant beneficiation of chromite ore from Bird River, Manitoba

    By P. R. A. Andrews, I. Jackman

    "A mineral processing investigation to recover chromite was performed at Lakefield Research, under the guidance of CANMET personnel, on a 70 tonne ore sample from the Bird River deposit in Manitoba. I

    Jan 1, 1988

  • CIM
    Electrical Drive Systems for Loader Shovels

    By C. E. McCoy

    This paper will discuss briefly loader shovel requirements and then present a detailed survey of electrical drive systems to meet these requirements. The survey in general will deal with the various e

    Jan 1, 1979

  • CIM
    Background and production history

    By W. F. Moore

    "In January 1981, Quintette Coal Limited (QCL) signed a 2a-year coking coal sales agreement with the Japanese Steel Industry which was followed by the commencement of mining operations in October 1982

    Jan 1, 1988

  • CIM
    The economics and marketing of Canadian potash

    By M. A. Upham

    "Prairie Evaporites of the Province of Saskatchewan in a deep oil-well hole. Exploitation started in 1950 under a shroud of doubt that this huge reserve could be mined. It was fraught with almost insu

    Jan 1, 1980

  • CIM
    Semi-Autogenous Grinding: A Comparison With the Conventional Route

    By Derek J. Barratt

    This paper compares a number of operating conventional and semi-autogenous grinding circuits and analyzes them in regard to operating and capital costs, specifically as applied to porphyry copper ores

    Jan 1, 1979

  • CIM
    The application of high density paste backfill at Dome Mine

    By D. L. Churcher, R. J. Perry

    "In recent years much work has been don e to examine alternate underground backfill support systems with the objectives of improving ground support and reducing mining costs. This report deals with th

    Jan 1, 1990

  • CIM
    Adaptation of a friction hoist system to a drum hoist system

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Adaptation of a friction hoist system to a drum hoist system (ClM Bullet in, November 1982)

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Geology of the NICO Au-Co-Bi Deposit & Sue-Dianne Cu-Ag Deposit, Southern Great Bear Magmatic Zone, Northwest Territories, Canada

    By Robin E. Goad

    ?Located 160 Km northwest of Yellowknife, NWT, Canada Current winter road access ?New all-weather road planned ?Power within 22 km ?Hwy to Edmonton 80 km south Close to existing infrastructure

    May 1, 2006