Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Collectorless and Collector-Induced Flotation of Chalcopyrite in Stockpiled Ni-Cu Ores

    By B. Nanthakumar

    The impact of stockpile oxidation on chalcopyrite was studied through collectorless and collector-induced flotation conditions. In both cases, the Cu grade-recovery performance of stockpiled ore showe

    Jan 1, 2007

  • CIM
    Experience With Iron Control Practices and Phased Capacity Enhancement at Hindustan Zinc Limited, Zinc Smelter, Debari Udaipur, India

    By Y. L. Mehta

    The working experience of the Zinc Smelter, Debari, Udaipur with process modifications and iron control practices is described in detail in this paper. Most of the modifications were made at different

    Jan 1, 2006

  • CIM
    Improving Flotation Circuit Performance with a Large Mechanical Flotation Cell

    By R. Grau

    "After commissioning and start-up of the first 500m3 TankCell® flotation cell in 2014, the over 300m3 mechanical flotation cells have earned their place in large-scale flotation operations. These 500

    Jan 1, 2019

  • CIM
    Innovative Process for Metals Recovery from Nuclear and Mine Wastes

    By J. F. Fiset, N. Bouzoubaâ, N. Reynier, C. Laviolette, Canadian Nuclear Laboratories

    Canadian Nuclear Laboratories (CNL) is developing a disposal strategy for radioactive wastes, which contain significant amounts of uranium, cesium, and mercury. There are safety and economic incentive

    Jan 1, 2016

  • CIM
    Effect of Impurity and Pretreatment Conditions on the Catalytic Activity of Au Powder for CO Oxidation

    By Yasuo Iizuka

    We have had studied CO oxidation on unsupported Au powder (mean particle size, ca.100nm) manufactured by evaporating ultra high purity gold metal (>99.99%) in inert gas and reported that it showed som

    Oct 1, 2003

  • CIM
    Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Processing And Tailings Management

    By Sean Hillacre, Arthur Lieu

    NexGen’s approach to uranium processing design including the crushing/grinding and leaching of raw ore through to yellowcake precipitation and tailings management focuses on minimizing surface footpri

    Jan 1, 2020

  • CIM
    Evcc ?cro

    By CRO CRO

    Elk Valley Coal?s Cheviot Project is located in the Alberta foothills south of the town of Hinton. The mine has been in operation now for the 3 years. The start up and subsequent operation of the Ch

    May 1, 2007

  • CIM
    Advanced Technologies for Mobile Underground Equipment

    Productivity and efficiency of diesel-powered underground trucks and LHDs can be enhanced through the application of a range of advanced technologies. In addition, these machines are subject to ever m

    May 1, 2002

  • CIM
    A Reconnaissance Geochemical Survey In the Seal Lake Area, Labrador

    By J. J. Brummer

    "A reconnaissance geochemical survey, using the stream sediment technique, is described. The survey covered an area of about 400 square miles, in the Seal Lake area of central Labrador, underlain by b

    Jan 1, 1960

  • CIM
    Electrical Generation and Operating Costs at Cassiar's Power Plant

    By A P. Powell

    This paper deals with the power plant at Cassiar Asbestos Corporation Ltd., Cassiar, B.C. It discusses the units installed in the plant, the distribution of power and the costs involved. The efficienc

    Jan 1, 1965

  • CIM
    The Extraction of the Basal Reef below the Weak Khaki Shale at Harmony Gold’s Tshepong Mine

    By K R. Brentley

    "Tshepong Mine, Harmony’s largest gold producing mine, is situated in the Free State portion of the Witwatersrand Basin, east of Odendaalsrus and north of Welkom, South Africa. The Basal reef is a nar

    Jan 1, 2015

  • CIM
    Characterizing Pitting Corrosion of 90/10 Cupro-Nickel Chiller Tubes

    By G. P. Gu

    The in-service 90/10 cupro-nickel tubes in a water-chiller system suffered from severe corrosion damage during their relatively short service life causing unexpected down time. In addition to downtime

    Jan 1, 2005

  • CIM
    Increasing Paste and Hydraulic Backfilling Efficiency Through Instrumentation

    By B. D. Thompson

    Many mines adopt necessarily conservative backfilling strategies due to a lack of understanding of their backfill behaviour. In the past five years, extensive instrumentation campaigns have focused on

    Aug 1, 2013

  • CIM
    Adding Value To Lix / Sx / Ew Operations By Recovering Copper From Bleed, Raffinate And Other Plant Streams

    By E. R. Dixon

    Copper SX/EW plants often bleed part of their electrowinning electrolyte to control impurities and maintain consistent cathode quality. Depending on the specific situation at each site, the bleed is e

    Jan 1, 2007

  • CIM
    Thermal-Mechanical FEA Modeling of Furnace Hearth Refractory for Design and Campaign Life Improvement

    By K. Chomyn, R. Veenstra, P. Zangeneh, Hatch Ltd., C. Van der Woude, H. Ghorbani

    "The furnace is the heart of smelting operations, and therefore the performance, reliability, and campaign life of the furnace are critical considerations. Furnace refractory is exposed to high tempe

    Jan 1, 2016

  • CIM
    Practical Considerations for the Use of Microseismic Systems at Mining Operations

    By Ian S. Leslie

    Seismic monitoring systems for mining operations are being utilized more than ever before in the characterization of rock mass response to underground and open pit mining. This paper provides a review

    Jun 1, 2012

  • CIM
    Accurate Live Measurments for Shaft Aligment during Sinking or Shaft Remediation

    By G. Bonin, A. Jamal, G. Preciado, S. Gillis

    "Accurate, easy to obtain, and reliable methods of measurement are the cornerstone of shaft and tunnel developments - during their sinking, operation and maintenance, or in some cases, remediation. Th

    Jan 1, 2019

  • CIM
    SPLC - A Power Supply for Smelting Furnaces

    By T. Gerritsen, C. Martinez, F. Stober, T Ma, J. R. Frias, M. Sedighy, J. Janzen

    Electrode control systems regulate power by physically positioning electrodes. Due to the weight and inertia of the electrodes and hoist equipment, this is a relatively slow process where power fluctu

    Jan 1, 2005

  • CIM
    Arsenic Disposal Practices in the Metallurgical Industry

    By P. A. Riveros

    The literature on the arsenic disposal practices of the metallurgical industry and the long term stability of the disposed arsenic compounds were reviewed from a Canadian perspective. The review was c

    May 1, 2002

  • CIM
    Reduction Kinetics of Goro Nickel Oxide Using Hydrogen

    By M. Wu, G. Plascencia, A. E. M. Warner, A. Vahed, T. A. Utigard

    Nickel oxide granules formed by pyrohydrolysis of a chloride solution, were reduced in hydrogen. Below 400 °C, an incubation period was observed, followed by very slow reduction. In the temperature ra

    Jan 1, 2005