Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Uranium in Early Proterozoic Aillik Group, Labrador

    By Sunil S. Gandhi

    "Uranium occurrences are widely distributed in tuffaceous-argillaceous beds and abundant rhyolitic volcanic rocks of the upper Aillik group, which is more than 3 km thick and over 125 km by 40 km in a

    Jan 1, 1986

  • CIM
    Applications of Mineral Fillers in the Paint and Plastics Industries

    By Kurt F. Weitz

    "The number of materials that can be classified as fillers covers an extremely wide range: this paper outlines those fillers of the industrial mineral type that find extensive application in the paint

    Jan 1, 1970

  • CIM
    Coal Preparation - A two-part paper on problems encountered in a modern coal preparation plant and how they were dealt with - Part 1 Low-gravity separation

    By B. W. Clyburn

    "Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing a/l essential properties to provide metallurgical c

    Jan 1, 1980

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • CIM
    Methane Conditions in 11 Seam

    1.Assessment of methane content in coal. Given a naturally low methane content in 11 Coal Seam and the fact that the areas of the 11 Seam adjacent to the tunnelway were degassing for a very, very lon

    May 1, 2003

  • CIM
    Observations and Numerical Back Analysis of an Excavation in the Queenston Mudstone

    By M. A. Perras, M. S. Diederichs

    "The Niagara Tunnel Project (NTP) is a 10.1 km long water-diversion tunnel in Niagara Falls, Ontario, which was excavated by a 14.4 m diameter tunnel boring machine. The excavated rock types included

    Jan 1, 2015

  • CIM
    Canada Fluorspar (NL) Inc. St. Lawrence Fluorspar Project – Flowsheet Development

    By M. Stogran-Baker, E. Legault-Seguin

    "Fluorspar mining in the St. Lawrence area of Newfoundland and Labrador began in the 1930s and ended in the mid-1980s. In 2013, Canada Fluorspar (NL) Inc (CFI) discovered a new ore body, the AGS vein,

    Jan 1, 2018

  • CIM
    Geochemical dispersion of uranium in overburden-covered regions

    By John J. Barakso

    A summary of geochemical dispersion processes is presented. Secondary and tertiary dispersion of uranium was examined at several uranium prospects in British Columbia. The vertical migration of urani

    Jan 1, 1979

  • CIM
    The Use of Jarosite Residues with Bauxsoltm to Remove Arsenate from Drinking Water and Industrial Waste Waters

    By D. McConchie

    BauxsolTM, prepared by treating bauxite refinery residues with Mg2+ and Ca2+, has an excellent ability to remove arsenic from acidic waters. The addition of BauxsolTM to sulphidic waste rock at the Gi

    Jan 1, 2006

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • CIM
    BLASTCAD - Noranda's three-dimensional computer-aided underground blast design system

    By P. Favreau

    "This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out undergroun

    Jan 1, 1993

  • CIM
    The Development and Commissioning of Ontario’s First Diamond Mine: Victor Diamond Mine (5f420872-c005-4976-9f70-552c4de7bef5)

    By N. Morrison, I. Holl, R. Welyhorsky, A. Hempstock

    ABSTRACT: The Victor diamond mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario. The process

    Jan 1, 2011

  • CIM
    The Noranda Process after six years of operation

    By A. G. Storey, J. B. W. Bailey

    "The Noranda Process at the Horne Division ofNoranda Mines Limited now smelts approximately 350,000 short dry tons of concentrate a year, which is 40% of the total smelter throughput. Campaigns are av

    Jan 1, 1980

  • CIM
    Cover Systems And Landforms For Remediation Of Uranium Mining And Milling Waste – Practical Insights

    By B. K. Ayres

    Modern management of uranium mine or mill waste storage facilities (WSFs) often requires that they be remediated or decommissioned with a cover system. In addition to creating a self-sustaining landsc

    Jan 1, 2020

  • CIM
    Estimating the Energy Recovery Potential of Newmont’s Carlin Mine Dry Grinding Circuit

    By Aidan Giblett, Michael McGlynn, Peter Radziszewski

    "On the basis that 99% of the energy input into a mill is converted into heat, it is possible to estimate the amount of energy captured in the slurry, the amount that is lost to the environment as wel

    Jan 1, 2016

  • CIM
    Falconbridge Mine-No. 9 Internal Shaft and Facilities

    By V I. McCallum

    In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ

    Jan 1, 1964

  • CIM
    Commuting To Work At The Mattabi Mine

    By J. C. White

    "During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i

    Jan 1, 1976

  • CIM
    Mineral Waste Resources of Canada

    By R. K. Collings

    The annual production of mineral and mineral-based wastes in Canada is conservatively estimated to be 400 million tons. Over 90 per cent of this amount is waste rock or mill tailings from the mining a

    Jan 1, 1978

  • CIM
    Connecting Mines and Communities: An Overview of the Elk Valley in S.E. British Columbia

    Delivering Our Products On any given day in North America, 80 kilometers of rail cars are engaged in moving our product. Global Customer Base Our business accounts for more than 30% of all bulk

    May 1, 2006

  • CIM
    A Theoretical Approach to the Evaluation of In-Situ Coal

    By K. W. Edwards

    The formulation of a theoretical basis for the evaluation of in-situ coal through the use of geophysical logs is outlined. This involved the development of an approach to the interpretation of resisti

    Jan 1, 1978