Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Computer Simulation of the Control Systems for the Heavy Media Coal Preparation Process

    Computer simulation of the control systems for the heavy media coal washing process have been presented in this paper. The simulation model applies the Simulink module of the Matlab 5.1 software pac

    Jan 1, 1998

  • AUSIMM
    Fuzzy System for Coal and Gas Outburst Risk Assessment

    By Alvarez A. R, Garcia H. l

    A fuzzy expert system, DIME, has been developed, under Matlab v 5.1. to assess the coal and gas outburst risk in underground mining. Expert systems and fuzzy logic are powerful tools to manage infor

    Jan 1, 1998

  • AUSIMM
    The Assessment of Alumino-Sillicate Refractories Raw Material in Indonesia: An Exercise in Mineral Resource Planning

    By J H. Baker, P G. Beadle, J P. O&apos, Brien

    In 1974 a preliminary study of the refractories industry in theRepublic of Indonesia was completed by Crown Lynn Consultants, a subsidiary of Cerarnco Ltd., on behalf of the Indonesian and New Zealand

    Jan 1, 1978

  • AUSIMM
    Solvent Extraction at Rum Jungle

    Consideration was given to the.applicab on of a solvent extraction circuit to be'included in the process'for the-recovery of a high grade product from.:-the Rum Jungle Creek.South uranium or

    Jan 1, 1963

  • AUSIMM
    New Zealand Platinum Deposits ù An Overview

    By R G. Barker, N Mortimer

    In New Zealand, platinum group metals (PGM) occur in three main geological environments of economic interest: layered mafic igneous complexes, the Dun Mountain Ophiolite Belt, and in association with

    Jan 1, 2002

  • AUSIMM
    Analysis of Gases and Airs from Collieries

    The Coke Ovens Laboratory at Australian Iron & Steel, Port Kembla has been involved in the analysis of seam gases and mine airs for approximately twenty (20) years. This period has seen many develo

    Jan 1, 1983

  • AUSIMM
    SXHD Crusher Developments at the Copper Concentrator, Mount Isa Limited

    By Molloy GR, Eaton RA

    The crusher development programme for 7ft Super Extra Heavy Duty (SXHD) Symons cone crushers commenced in 1984. The main objective of the programme was to run the crushers at maxi- mum power for the

    Jan 1, 1988

  • AUSIMM
    Characterisation of Ilmenites from Western Eucla Basin Heavy Mineral Concentrates

    By G J. Sparrow, M J. Fisher-White

    A mineral and chemical characterisation study was conducted on ilmenite-rich heavy mineral concentrates sourced from the western sector of the Eucla Basin in southern Australia. Test work involved usi

    Jan 1, 2008

  • AUSIMM
    Capital Optimisation in the Coal Industry

    The optimisation of capital in the total planning context has broadly two components: ò maximising the efficient utilisation of capital against competing capital demands; and ò maximising the effici

    Jan 1, 1991

  • AUSIMM
    The Introduction and Application of Carbon-in-Pulp in a Heap Leach Project

    By Mann LD

    The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro

    Jan 1, 1982

  • AUSIMM
    The Engineering Tasks

    By Cairncross A. A

    Papers on technical aspects of the Melbourne Underground Rail Loop project are being presented at this conference or have been presented previously or will be presented at other forums. This paper

    Jan 1, 1981

  • AUSIMM
    Environmental and Social Aspects of Mining in Australia

    The environmental and social responsibilities of the mining industry have long been recognized by the industry itself, but during the past decade it became one of the main targets for the more rad

    Jan 1, 1978

  • AUSIMM
    Collection and Application of Geological Data for Design of Underground Openings at Mount Isa

    By Blair JR

    The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered

    Jan 1, 1976

  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    Merrill-Crowe/Carbon-in-Pulp an Economic Evaluation

    By King ND

    This paper presents an economic study comparing two gold recovery processes, zinc precipitation (Merrill-Crowe) and carbon-in-pulp (CIP). Capital, operating, and gold losses costs from an actual CIP

    Jan 1, 1982

  • AUSIMM
    Civil, Criminal and Professional Liability of Experts or ""Caveat Expert""

    By Jackson E

    The general level of awareness amongst members of the professions that they are faced with an increasing number of claims for breaches of their professional duty was dramatically heightened by the d

    Jan 1, 1989

  • AUSIMM
    Improving Low-Grade Ore Recovery with the use of Efficient Blasting Techniques

    Drilling and blasting operations have historically been viewed as a necessary 'evil' part of mining, whose costs should be minimised by whatever means possible. In the past, when operation

    Jan 1, 1998

  • AUSIMM
    Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia

    Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid-Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. The

    Jan 1, 1995

  • AUSIMM
    Mine Dewatering and Water Disposal Bendigo Goldfield

    By Showers JAF

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    Convergence and Load Measurements in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    This paper describes the conver- gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventiona

    Jan 1, 1992