Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.

    By Fallins J

    THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately

    Jan 1, 1930

  • AUSIMM
    Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom Price

    By J Austin, R Bitencourt

    Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month

    Jan 1, 2005

  • AUSIMM
    A Simulation Model of the Waste Handling System Proposed for the Lihir Project in Papua New Guinea

    By Ritter K-C, Sturgul J. R, Filess T

    The proposed Lihir open pit gold mine is located on Lihir Island in New Ireland Province, Papua New Guinea. The mine will be located within a volcanic caldera, part of which forms the adjacent Luise

    Jan 1, 1995

  • AUSIMM
    Geodynamic Modelling as an Exploration Tool

    By Y Zha, J L. Walshe, A Ord, N J. Archibald

    The purpose of this paper is to discuss the concept of Geodynamic Modelling as an exploration tool and to provide a specific example, namely, the Century Zinc deposit in Northern Queensland. Geodynami

    Jan 1, 2000

  • AUSIMM
    Mine Water Resource Management Systems

    By Gillies A. D S, Lee A. H

    The major operational objectives of a mine water resource management system (WRMS) are to supply the water needs of the mine and mill, to minimise disturbance to mining due to rainfall flooding or see

    Jan 1, 1992

  • AUSIMM
    Planning and Designing Cavities for Underground Power House in Himalayas

    By Garg R. K

    Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and compris

    Jan 1, 1987

  • AUSIMM
    Canadian Reporting Practices

    In 1556, Agricola noted that "a prudent owner, before he buys shares, ought to go to the mine and carefully examine the nature of the vein, for it is very important that he should be on his guard l

    Jan 1, 1987

  • AUSIMM
    Rehabilitation of Mine Tailings by Simultaneous Prevention of Oxidation and Treatment of Acid Effluents Using a Wood-Waste Cover

    By N TassT, J Cyr

    At the East Sullivan site, wood wastes covering the abandoned mine tailings impoundment prevent sulfide oxidation by creating an anoxic environment. The addition of coarse ligneous wastes and their hi

    Jan 1, 2003

  • AUSIMM
    Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation Models

    By I Brunton

    Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi

    Jan 1, 2001

  • AUSIMM
    Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)

    The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition

    Jan 1, 1980

  • AUSIMM
    Water Quality Trigger Values for Suspended Mud in the Jabiluka Mine Receiving Catchment, NT, Australia

    By M J. Saynor, W D. Erskine an, D R. Moliere

    The Jabiluka uranium mine was constructed in the Ngarradj catchment, a right bank tributary of Magela Creek in the Northern Territory. The Jabiluka Mineral Lease is adjacent to Kakadu National Park, n

    Jan 1, 2004

  • AUSIMM
    Pressure filtered tailings – environmental and cost benefits

    By R Williams, P Godwin

    In a time of changing rainfall patterns and in the light of recent tailings dam failures, there is closer environmental scrutiny for proposed tailings dam construction or expansion. Therefore the elim

    Sep 11, 2017

  • AUSIMM
    Rating Dilution Risk at Pajingo Gold Operations

    By R Huntley, D Sims

    Pajingo gold mine produces over 240 000 oz Au per year from underground mining using longitudinal bench stoping methods with a 15 m sublevel interval. Average mine head grade is around 12 g/t Au, cont

    Jan 1, 2002

  • AUSIMM
    Maintaining the Benefit - How to Ensure Mine to Mill Continues to Work for You

    By D La Rosa, W Valery, A Jankovic, S Ese

    Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing æMine to MillÆ or Process Integration and Optimisation (PIO) studies. MMPT-AP

    Jan 1, 2007

  • AUSIMM
    Underground Mobile Crushers

    By Tukkimies M

    During the late-1980s crawler-mounted crusher units established their position in the aggregates industry. Between 1986 and 1994 about 700 units were delivered to customers all over the world for s

    Jan 1, 1995

  • AUSIMM
    Factors Influencing the Choice of Cooling and Refrigeration Systems for Mines

    By R W. Wilson, A R. Branch

    For hot mines, the use of mechanical refrigeration machines has become an essential feature of ventilation and cooling systems. Over the last 30 years, considerable effort has been made in developing

    Jan 1, 2005

  • AUSIMM
    Bendigo Mine Grade Control

    Bendigo is AustraliaÆs second-most productive goldfield, having produced some 22 million ounces of gold between 1851 and 1954. Bendigo Mining Limited (BML), the sole lease-holder of the Bendigo Goldfi

    Jan 1, 2006

  • AUSIMM
    The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

    By S Miller, A Neale

    As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to furth

    Jan 1, 2003

  • AUSIMM
    Application of High-resolution Seismic Reflection Surveys to Exploration for Blind Vein Systems at the Cracow Low-sulfidation Epithermal Field

    By J Cook, S Pike, D Pridmore

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The application of high-resolution seismic reflection to map structure and/or mineralisatio

    Mar 18, 2015

  • AUSIMM
    Investigations and Improvements to Ground Control Systems Used at Xstrata Copper ù Mount Isa Copper Operations

    By B Andrew, L Krois

    Ground control systems, including ground control management, play an integral role in the effective and efficient extraction of copper ore at the Xstrata Copper û Mount Isa Copper Operations (MICO). R

    Jan 1, 2005