Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    A Revolution in Raise Boring – The Development of the RBR900VF

    By R J. Wood

    Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn

    Mar 24, 2014

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    Water and Soil Management Responsibilities

    Both the miner and the Regional Water Board have legal obligations to ensure that all discharges of water from a mine site are free of harmful wastes, and that proper authorisation is obtained to abst

    Jan 1, 1986

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia Metro

    Subsurface development requires some geotechnical conditions and challenges. Most of then are related to the compatibility between tunnelling system and surrounded ground conditions, and design criter

    Jan 1, 1999

  • AUSIMM
    Comparative Study of Iron Ore Characterisation by Optical Image Analysis and QEMSCANTM

    By E Donskoi

    In order to develop downstream processing routines for iron ore and to understand the behaviour of the ore during such processing, extensive mineralogical characterisation is required. To determine mi

    Jul 11, 2011

  • AUSIMM
    Slag chemistry on the Moon

    By M G. Shaw, M A. Rhamdhani, S P. Singh, A R. Duffy, B Eisenbart, A K. Shukla, G A. Brooks

    The field of astrometallurgy is a growing area of study. Metal production on the Moon is likely to begin in less than a decade as major space agencies such as NASA (National Aeronautics and Space Admi

    Aug 21, 2024

  • AUSIMM
    Developments in the Use of Waikato Refractory Clays

    The refractory industry in New Zealand is small, consisting of two main manufacturers - one at Huntly and the other at Kamo. Together these would have an annual refractory production of about 30 000 t

    Jan 1, 1976

  • AUSIMM
    Experiences in Developing Applied Mining Research Contracts

    The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing

    Jan 1, 1986

  • AUSIMM
    Quantifying the Economic Risk of Suboptimal Mine Plans and Strategies

    By J C. de Vries

    When times are tough in the mineral industry û as they have been for some time û typical responses by mining companies are to cut costs and/ or increase production. The latter is seen to spread fixed

    Jan 1, 2003

  • AUSIMM
    The Golden Cross Closure Experience - A Success Story or a Work Without End?

    The Golden Cross is the first large precious metals mine to be both commissioned and closed in the æmodernÆ era in New Zealand. This paper discusses the life cycle of the Golden Cross mine, with empha

    Jan 1, 2006

  • AUSIMM
    The Toba Tuffs and Lake Toba Caldera, Sumatra

    By Caress ME, Knight MD

    The eruption 75,000 y ago of the Younger Toba Tuff ignimbrite and associated ash-fall ranks as the greatest known volcanic event of the past million years. The ignimbrite is known to cover 21,000 km2

    Jan 1, 1990

  • AUSIMM
    The QSL Lead Process

    The QSL continuous lead smelting process incorporates two basically different pyro- metallurgical operations: roast-reaction, smelting of galena concentrate, followed by carbothermic reduction of s

    Jan 1, 1984

  • AUSIMM
    Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty

    By R Dimitrakopoulos, R Goodfellow

    One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a

    Nov 24, 2014

  • AUSIMM
    Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation (c28c0d5f-5fb9-42f8-9b13-de3161c056c3)

    By M Wortley, J McKay, D La Rosa, O Guyo

    It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont

    Jan 1, 2006

  • AUSIMM
    Technical Note - Polygonal Blocks of Influence in Triangular Grids (7b8a5598-0e35-4903-9cf3-ac2957008841)

    Tasker (1985) has detailed the accepted practices for constructing polygonal blocks of influerrce in the estimation of ore reserves. Further he suggests that users might fall into traps such as omissi

    Jan 1, 1985

  • AUSIMM
    Reduction of Mechanical Entrainment by Polymer Depressants

    By Y Peng, D Wannas

    In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl

    Jan 1, 2005

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014