Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Investigating psychosocial incidents and gendered violence for enhanced mine safety outcomes

    By D Flint, K Vague

    The Work Health and Safety Act 2020 (WA) (WHS Act; DMIRS, 2020) and associated Work Health and Safety (Mines) Regulations 2022 (WA) (WHS Regulations; DMIRS, 2022), supporting guidance materials and ot

    Apr 16, 2024

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planning

    By M Akop, G Phillips, L Elliott

    An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo

    Mar 22, 2022

  • AUSIMM
    A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysis

    By S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen

    Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result

    Jul 1, 2021

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Dissolution of quartz in Mn-slags during production of SiMn alloy

    By S Jayakumari, E Ringdalen, V Canaguier

    Silicomanganese (SiMn), containing approximately 16–30 per cent Si, is produced in submerged arc furnaces using various Mn sources and quartz as the primary raw materials, along with fluxes and reduct

    Jun 19, 2024

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Geohazmap Implementation in Block Cave Mines

    By S Talu, E Savage, S Howe

    Major falls of ground, strainbursts, airblast and mudrush events are the major hazards in block caving environments, resulting in both safety and financial consequences and losses. Rio Tinto mines hav

    May 9, 2016

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    The Otago Schist, New Zealand and the Klondike Schist, Canada û A Comparison of Two Historic Gold Fields

    By D Craw

    Otago Schist and Klondike Schist are two Paleozoic-Mesozoic metamorphic belts on the circum-Pacific margin in which there has been a long history of abundant alluvial gold mining, but only minor hard-

    Jan 1, 2007

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011