Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Updraught Sintering

    By Green A. D M

    The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima

    Jan 1, 1964

  • AUSIMM
    Description of Lead Refinery

    The building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is

    Jan 1, 1918

  • AUSIMM
    Mineralogical Characterisation of Iron Ores From Noamundi, India With Special Emphasis on Beneficiation of Iron Ore Fines

    By V Kumar, A S. Venkatesh, R K. Upadhya

    The enormous iron ore deposits of eastern India are part of the volcano-sedimentary basins containing iron and to some extent manganese deposits that belong to the Iron Ore Group (IOG) of Archaean Sin

    Jan 1, 2005

  • AUSIMM
    Developing flotation circuit control and automation for the Phu Kham Copper-Gold Operation concentrator

    By L Mikhael Gurieff, D Baas

    The Phu Kham Copper-Gold Operation (Phu Kham Operation) is located in the Lao People's Democratic Republic and is owned and operated by the Lao-registered company, Phu Bia Mining Limited (PBM). Au

    Aug 29, 2018

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    The Scratch Test – An Attractive Method to Measure the Strength of Iron Ore Material

    By L Mariano

    Three selected iron ore samples from the major bedded and channel iron deposits of Western Australia were analysed using a scratch test commonly used in the oil and gas industry. The portable commerci

    Jul 11, 2011

  • AUSIMM
    Ore Shoot Targeting by Recognition of Upflow and Outflow, Low Sulphidation Epithermal Gold Deposits

    By J V. Lawless

    Two types of low sulphidation epithermal deposits that have different gangue mineralogies and ore shoot geometries are recognised. One has laterally near-continuous ore shoots over a significant verti

    Jan 1, 1999

  • AUSIMM
    An Investigation of Ammonium Nitrate Loss to Mine Discharge Water at Diavik Diamond Mines

    By G MacDonald, B Forsyth, D Corkery, T

    An investigation was carried out at Diavik Diamond Mines Inc (DDMI) to identify and quantify the mechanisms through which ammonium nitrate (AN) was entering the mine discharge water. The goal was to d

    Jan 1, 2007

  • AUSIMM
    Current Studies of Practical Rock Mechanics in Underground Mining in Australia

    By K J ROSENGREN

    Underground rock mechanics was initiated as a formal discipline in Australia by early studies for underground structures for the Snowy Mountains Scheme in the 1950s. These techniques were quickly e

    Jan 1, 1992

  • AUSIMM
    JORC and Mineral Resource Classification Systems

    The JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in

    Sep 26, 2011

  • AUSIMM
    Impurity capacities of non-ferrous slags

    By R G. Reddy

    The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The

    Aug 21, 2024

  • AUSIMM
    Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant Design

    By K B. Quast

    During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri

    Jan 1, 1998

  • AUSIMM
    Geological Aspects of the Discovery of Important Minerals in Australia - Nickel Sulphide Deposits of Western Australia

    The discovery of nickel sulphide deposits at Kambalda in 1966 heralded the development of ò an industry with a capital value of over $1.5 billion producing about 10% of the western world's nick

    Jan 1, 1988

  • AUSIMM
    Comparison of two and three‐dimensional seepage analysis in tailings dams – a case study

    By N Yarahmadi

    Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab

    Jul 1, 2021

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    The Practical Implementation of Dewatering and Depressurisation in Large Open Pits

    All large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv

    Jan 1, 2003

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014