Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    Relocating Waihi's Cornish Pumphouse

    WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant

    Jan 1, 2006

  • AUSIMM
    An Overview of Geotechnical Issues in Narrow Vein Mining

    By M P. Sandy, J B. Albrecht

    "Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or

    Mar 26, 2012

  • AUSIMM
    The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smelting

    By A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat

    The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para

    Aug 21, 2024

  • AUSIMM
    Performance of Shallow Water Covers on Pyritic Uranium Tailings

    By N K. DavT, A Coggan

    The performance of in situ, shallow water covers in controlling acid generation was evaluated at four recently decommissioned pyritic uranium tailings sites at Elliot Lake, Ontario, Canada. The tailin

    Jan 1, 2003

  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • AUSIMM
    The Flow Properties of Colliery Spoil Rockpaste as Used in the Infilling of Abandoned Mine Workings (3bed0e3c-7be6-4717-a5a7-48443e75e4fa)

    By Jarvis ST

    Colliery spoil is the major constituent of colliery spoil 'rockpaste' which has been used to infill abandoned limestone mines in the West Midlands of England since the early-1980s. The oth

    Jan 1, 1998

  • AUSIMM
    The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure Plan

    By T A. Short, P L. Brown

    Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh

    Jan 1, 2003

  • AUSIMM
    Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine Development

    By L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang

    The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.

    Jul 10, 2012

  • AUSIMM
    Gravity Gold Recovery in Obuasi Mines

    Mining operations in the Obuasi mine of AngloGold Ashanti Limited began in 1897 using mainly gravity concentration and amalgamation to recover the gold from predominantly high-grade quartz ores. The m

    Aug 1, 2010

  • AUSIMM
    Evaluation of a Microcel<sup>TM</sup> Sparger in the Red Dog Column Flotation Cells

    By S Sims, A Stradl, G Hope, B Lacouture

    Column flotation cells have been installed in numerous base metal operations around the world. The majority of these cells utilise conventional air-only spargers to introduce air into the bottom of th

    Jan 1, 2005

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    Characterising the In Situ Conditions Within Rehabilitated Spoils at South African Opencast Collieries

    By F D. I Hodgson

    Twenty-seven observation test pits were excavated at four different spoils dumps at three collieries in the Witbank Coalfield. The holes were dug into the upper three metres of the spoils to ascertain

    Jan 1, 2003

  • AUSIMM
    Computing from a Remote Mine Site

    By Giedl JG

    Technical applications of computers within the coal industry are expanding rapidly with an increase in the number of users and user locations. Collinsville Coal Company Pty Ltd is an example of a

    Jan 1, 1983

  • AUSIMM
    Tailings Disposal Costs ù The Hidden Design Parameter

    The purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design

    Jan 1, 2000

  • AUSIMM
    Flotation of Unclassified Ball Mill Discharge for the Recovery of the Lead and Zinc Concentrates

    The sulphide ore occurring in the North Mine at Broken Hill is of a complex nature, consisting of an intimate mixture of argentiferous galena, marmatite (zinc-iron sulphide), and gangue minerals. A ty

    Jan 1, 1933

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    A Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill

    By K L. C Gontalves

    In 1999, the Mineral Development Centre of CVRD (CDM) acquired a flotation device referred to as Mini Pilot Plant (MPP), which is able to run continuous flotation tests with drill core samples. Since

    Jan 1, 2005

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013