Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work ProgramBy T Bookless, J Pownell, D Meadows
The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more
Sep 26, 2013
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Using Borehole Radar to Refine Orebody Interpretations in a Narrow Vein Gold DepositBy G Morgan, C Kemp
In December 2010, a trial of borehole radar technology was conducted to test the usefulness of the technique in better refining the position and geometry of narrow vein orebodies away from the primary
Mar 26, 2012
-
Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope DesignBy C Bellia, A Maldonado, S Strong, H Baxter
This paper discusses the technical and cost benefits of alternative data collection techniques used to collect lithological information, obtain laboratory testing samples and perform in situ testing.
Jul 13, 2015
-
Project and execution of the excavation for a haulage shaft with raise boring techniquesBy M Orunesu Preiata
The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo
Mar 29, 2023
-
Real-Time Risk Analysis and Hazard ManagementSafety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar
Jan 1, 2005
-
A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’By P Revell, B Adair, D King, L Keeney
Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection
Nov 10, 2020
-
The upgrading of low-grade nickel ore stockpiles at Western Areas Ltd Forrestania operations, using a mobile ore sorting plantBy A Parry, C Fitzmaurice
After conducting laboratory ore sorting testwork on samples of a low grade nickel ore stockpile at Western Areas’ Flying Fox nickel mine, a mobile crushing, screening and ore sorting plant was located
Aug 29, 2018
-
The Value of Consulting with the CommunityBy M L. van Kampen
The recent (2005) amendments to the Resource Management Act 1991 have made it clear that there is no obligation on an applicant to consult. However the importance and value in consulting with the comm
Jan 1, 2006
-
Mining in Morobe, Papua New Guinea – Impacts, Assurance and Self-determinationBy C Roche, G M. Mudd
The Morobe Province of central Papua New Guinea (PNG) has been mined for gold for nearly a century, although it is only in the past decade that large-scale modern mining commenced. The Hidden Valley g
Jul 16, 2014
-
Accounting for Vegetation Dynamics in Landform Evolution ModellingBy G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard
Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe
Jun 28, 2016
-
A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting processBy A Kamaraj, M Mohanasundaram, R Kumar, P Tikare
This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig
Aug 21, 2024
-
Proneness of competent over-stressed intact rock to violent fracturingBy B L. Sainsbury, M F. Lee, A Penney
For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo
Nov 30, 2018
-
Rock stress measurements – a site geotechnical toolkitBy P B. Hills
Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ
Nov 29, 2022
-
A Decade of Gravity Gold RecoveryBy A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen
Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon
Sep 26, 2013
-
Mining Zinc-Rich Massive Sulphide Deposits on Vancouver Island, British ColumbiaThe Myra Falls minesite, of Westmin Resources Limited, is located at the geographic centre of Vancouver Island, within the confines of Strathcona Provincial Park. The operation includes two active u
Jan 1, 1993
-
Tight slot blasting for routine fault-slip seismicity control at Mt Charlotte MineBy P Mikula, R Geranmayeh, R Carlton, M Ferguson, R Whiting
The concept of using specially designed slot blasts to mine through stress abutments that intersect faults, while controlling fault-slip seismicity, has come of age at Mt Charlotte Mine. Due to the hi
Nov 29, 2022
-
Multi-Stage Stochastic Optimisation for Managing Major Production IncidentBy R Razanatsimba, A Galli
A mining company has entered into contractual commitments to supply certain quantities of its product to clients in each time period. Failure to fulfil its obligations would damage its reputation as a
Sep 26, 2011
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
Designing and Planning for Maximum Grinding Mill Availability - A Team ApproachThe mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d
Jan 1, 2008