Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • AUSIMM
    Sampling and Grade Control Pratices at Misima Mines

    The Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en

    Jan 1, 1991

  • AUSIMM
    Mine Rehabilitation Case Studies on the West Coast

    By L Langer, R Simcock, M Davis

    Rehabilitation of mining sites helps to achieve the purpose 5(2c) of The Resource Management Act 1991 û æavoiding, remedying, or mitigating any adverse effects of activities on the environmentÆ. The e

    Jan 1, 1996

  • AUSIMM
    Copper Waste Dump Leaching

    Copper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr

    Jan 1, 1967

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • AUSIMM
    The Truth is Stranger than Fiction – the Story of Ridgeway Gold Mine

    By G Dunstan

    The Ridgeway gold mine has been an enigma of the international underground hard rock community for nearly 20 years. It nearly didn’t eventuate as it was more than 500 m below a farmer’s paddock in Cen

    May 9, 2016

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand

    By P E. H Gregg, R B. Stewart

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both tai

    Jan 1, 1995

  • AUSIMM
    The Tennant Creek Goldfield

    The Tennant Creek goldfield is situated in the Northern Territory, 360 miles north of Alice Springs, or a tot~l distance of 1,300 miles north of Adelaide, and 600 miles south of Darwin. The auriferous

    Jan 1, 1942

  • AUSIMM
    The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

    CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill

    Jan 1, 1946

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • AUSIMM
    The Use of Comparative Sampling Methods at Cleveland Mine, Tasmania

    The use of comparative sampling methods during the evaluation of the tin-copper deposits at Cleveland mine yielded closely checking average results from groove, channel, AXT split diamond drill core,

    Jan 1, 1968

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • AUSIMM
    An Update on the Geological Resource Map (Germ) Computerised Mineral Deposit Inventory Database

    The Geological Resource Map of New Zealand (GERM) is a computerised inventory of aggregate, mineral, coal, petroleum and thermal water occurrences, containing summary information on location, producti

    Jan 1, 1991

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders From Australian Ores (7b2536c4-12d9-4a3b-abac-9212e2d5236f)

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide fuel are of special interest to countries such as Australia that have their own uranium supp

    Jan 1, 1970

  • AUSIMM
    Arc Exploration from the Hydrothermal Plume Perspective

    By C E. J de Ronde, I C. Wright

    Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor

    Jan 1, 2002

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • AUSIMM
    Geometric Control for Strategic Mine Planning at El Teniente Mine

    By J Cornejo, A Pinochet, C Caviedes

    The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp

    May 9, 2016

  • AUSIMM
    Manufacture of Cement From Blast-Furnace Slag (6eef645a-945d-4a5e-8744-528d84407d12)

    THE successful establishment of iron blast-furnace plants at Newcastle and Lithgow naturally invites attention to the economic utilization of the various products and by-products arising out of the in

    Jan 1, 1918