Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Simple Evaluation Of Dynamic Pile TestsBy D. Kolymbas
A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r
Jan 1, 1989
-
The Zinc Refluxer at Cockle Creek (c0e1d8b7-f87d-4e4a-82d7-04847e44425f)Plant based on the New Jersey refluxing process was installed at the Cockle Creek Works of Sulphide Corporation Pty. Ltd. to refine portion of the zinc output from the Imperial Smelting furnace.Refini
Jan 1, 1970
-
Weathering of freshly exposed sulphides at the Arctic Mid-Ocean RidgeBy Rolf B. Pedersen, Ana Filipa Marques, Ingunn H. Thorseth, Ingeborg Okland
"Deep sea mining of polymetallic sulphides will change the physical and chemical conditions at the seafloor by creating scars when sulphides are removed, and potentially also by deposition of mine tai
Sep 1, 2014
-
Jet Grout Ground Modifications for the Brightwater Conveyance SystemBy Richard Hanke
Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,
Jan 1, 2008
-
Some Aspects of Pillar Stability in Underground Coal MinesWorking in thick coal seams presents many problems, included in these is obtaining the maximum recovery of coal under safe working conditions. In order to obtain maximum extraction it is important to
Jan 1, 1989
-
Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult ConditionsBy J. C. W. M. de Wit
An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the
Jan 1, 2006
-
Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and BlastingBy Roy McKinstry, Mark Rantapaa, Thomas Bolles
"More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi
Jan 1, 2004
-
Efeitos Do Ciclo Térmico De Uma Determinada Rota De Manufatura Sobre Componentes Automotivos Fabricados Com O Material Din En 10149 S700mcBy Daniel Angelo Zattera Milesi
Em determinadas rotas de manufatura de componentes automotivos, principalmente de produtos do segmento rodoviário pesado, são muito comuns processos de desempeno a quente, assim como outros procedimen
Aug 16, 2017
-
Hydrothermal Preparation and Characterization of LiMn2O4 for LI-ION Battery ApplicationBy W. J. Li, L. Kong, G. L. Li, X. M. Xi, J. Qiu
"A novel hydrothermal method was applied to prepare the precursor of LiMn2O4 using pre-treated electrolytic manganese dioxide (EMD) and lithium hydroxide as the main raw materials. The precursor was s
Jan 1, 2012
-
Eglinton Crosstown, a New Step in Toronto’s Subway SystemBy Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017
-
Efeito Da Adição De Nb Na Microestrutura De Ferro Fundido Branco Alto Cromo HipereutéticoBy Dimas de Andrade Pacheco
O estudo do efeito da adição de nióbio em um ferro fundido branco alto cromo tratado termicamente com 25%Cr e 3%C foi estudado neste trabalho por microscopia ótica, microscopia eletrônica de varredura
Oct 30, 2017
-
Emerald Mining in AfghanistanBy Antoni Kalukiewicz
From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza
Jan 1, 2005
-
Considerations for Effective Gold Process DevelopmentBy A Giblett, R Dunne, D Appelhans
There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be
Jul 15, 2013
-
Determinação Da Resistência Em Flexão De Compósitos De Matriz Poliéster Reforçados Com Fibras De Bagaço De Cana-de-açúcarBy Verônica Scarpini Candido
A utilização de fibras de naturais como agente de reforço tem sido amplamente estudada, pois é uma alternativa para o desenvolvimento de materiais sustentáveis. Assim esse trabalho tem por objetivo es
Oct 30, 2017
-
Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close ProximityBy Kentaro Kuraji
INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi
-
Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding PerformanceBy Robert E. McIvor
The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov
Jan 1, 2005
-
Kennecott Utah Copper Smelter ModernizationBy C. J. Newman
Before 1995, the smelting process at the Kennecott Utah Copper Corp. (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. When considering expansion, it was decided that the exis
Jan 1, 1999
-
Dragline monitoring, control, and navigationBy J. Hansen
"ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti
Jan 1, 2000
-
Reverse Column Flotation Of Iron OreBy T. C. Eisele
The use of column flotation was considered for the ?reverse flotation? of iron ore, where the gangue (quartz) was recovered in the froth product. This use of the froth for carrying the gangue mineral
Jan 1, 2007
-
Roof Bolting at John Darling Colliery, Belmont, New South WalesExperiments in the bolting of a mine roof were commenced at Elrington Colliery on the South Maitland Coal Field early in 1949, following the appearance of an article in the American publication, "
Jan 1, 1954