    Risk Assessment Applied to Excavation Ground Support

    By William Pitman

    Ground instability and subsequent rock falls are a major concern in underground mines. As a result, several mining companies are conducting risk assessments of the ground support installed in their mi

    May 1, 2004

  • SME
    Numerical Investigation of Factors Involved in a Floor Heave Mechanism in a Bump-Prone Coal Mine

    By Bo-Hyun Kim, Mark K. Larson

    "Bumps remain a critical safety concern in underground coal mining, despite significant advancements in engineering controls. These events occur when relatively high stresses in a coal pillar in conju

    Jan 1, 2019

  • SME
    Numerical Simulation of Fluid–Solid Coupling Heat Transfer in Excavation Roadway

    By Menglong Bian, Xiaotong Dong

    Thermal damage is an urgent problem faced by deep mining. High-temperature rock mass, hot water and electromechanical equipment are the sources of the thermal damage. The increase in air temperature i

    May 5, 2022

  • AIME
    Reservoir Engineering - Use of Permeability Distribution in Water Flood Calculations

    By W. E. Stiles

    A method is presented for predicting the performance of water flooding operations in depleted, or nearly depleted, petroleum reservoirs. The method makes use of permeability variations and the vertica

    Jan 1, 1949

  • AIME
    Reservoir Engineering - Use of Permeability Distribution in Water Flood Calculations

    By W. E. Stiles

    A method is presented for predicting the performance of water flooding operations in depleted, or nearly depleted, petroleum reservoirs. The method makes use of permeability variations and the vertica

    Jan 1, 1949

  • SME
    Analysis of particulate contamination in personal dust monitor sampling

    The National Institute for Occupational Safety and Health (NIOSH) has continued study of the Personal Dust Monitor (PDM) developed by Rupprecht & Patashnick Co. Inc. through a CDC contract and current

    Jan 1, 2009

  • DFI
    Environmental Impact Management Through Foundation System - Synopsis

    By Deshmukh A. M.

    Existence of human beings and their relationship with the nature is symbiotic. The lack of perspective and negligence of nature disturbs the equilibrium of environment and causes unprecedented disaste

    Jan 1, 1996

  • NIOSH
    RI 9137 - Electrokinetic Densification of Solids in a Coal Mine Sediment Pond-A Feasibility Study - (In Two Parts) 2. Design of an Operational System

    By R. H. Sprute

    The Bureau of Mines conducted a feasibility study and designed an operational system for consolidating waste coal sludge in a 110-acre pond by applying direct current between buried and floating elect

    Jan 1, 1988

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • SME
    Evaluation Of The NEPA Process For Estimating Water Quality Impacts At Hardrock Mine Sites

    By Kimberley MacHardy, Ann Maest, Greg Lawson, James Kuipers

    Although water quality predictions are often made in Environmental Impact Statements (EIS's) as part of the National Environmental Policy Act (NEPA), comparisons between predicted and actual wate

    Jan 1, 2005

  • AUSIMM
    Defining Optimal Post-Mining Land use for Different Sections of Mined Land Multi-Attribute Decision-Making Techniques in Through Different Open Pit Mining

    During the lifetime of an open pit mining project, each stage from exploration activities to exploitation and mine closure produces disturbances on the mining region. Mined land reclamation plans esta

    Dec 6, 2010

  • SME-ICGCM
    The Influence of Rock Mass Quality in Controlled Blasting (87c67f30-2368-4c33-b1ba-1ff98b35a5ef)

    By Paul Singh

    Blasting is an integral part of mining activity and is an inherently destructive process. The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dyn

    Jan 1, 2007

  • SME
    Using Optimizing Control System At CVRD’s Pelletizing Plants

    By Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi

    Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in

    Jan 1, 2005

  • IIMP
    Control fuzzy de molienda minerales

    By Alberto Pacheco Pacheco

    En el presente texto se analiza el fundamento de lógica fuzzy aplicada al control de molienda de minerales, la que nos permite simular el comportamiento humano en la operación molienda, con la que se

    Sep 12, 2005

  • SME
    MSHA?s DPM rule for metal and nonmetal mines

    By W. H. Pomroy

    In its 2001 diesel particulate matter (DPM) rule for metal and nonmetal underground mines, MSHA established an interim concentration limit of 400 micrograms of total carbon (TC) per cubic meter of air

    Jan 1, 2009

  • SME
    Automatic Creation Of Ore-Selection And Blast Polygons Using Clustering Algorithms

    There are multiple stages in a mining operation that a mining engineer has to draw polygons to be used as operation guidelines. These polygons are drawn by hand and based on engineer?s experience. How

    Feb 27, 2013

  • SME
    East Arlberg Highway Tunnel, Austria

    By Hans Treichl

    1. INTRODUCTION For Europe the Arlberg road tunnel signifies the elimination of the largest traffic barrier between Bucharest and Paris in the east-west transversal. Apart from that the tunnel will

    Jan 1, 1979

  • IIMP
    Un sistema de trabajo de jornadas atípicas en la unidad minera raura, de compañia minera raura s. a., que abre nuevos horizontes y garantiza una mejor productividad

    By Fanor Quinteros

    El presente trabajo señala el sistema administrativo de trabajo de 2 X 1 en la mina Raura aplicado desde setiembre del 2000, cuyos resultados obtenidos satisfacen las metas trazadas y justifican el co

    Sep 13, 2001

  • SME
    Compensation Issues In The Third World: A Ghanaian Perspective

    By K. W. Grubaugh

    Indigenous people are nearly always affected when projects enter their territory. Crop and other asset compensation can help or undermine a project’s progress depending on the approach. When compens

    Jan 1, 2002

  • SME
    Simulating Development In An Underground Hardrock Mine

    By D. Brunner, G. R. Baiden, H. J. Yazici

    System simulation is an increasingly popular technique for analyzing and improving existing as well as newly designed underground mining operations. An engineering firm that specializes in simulat

    Jan 1, 1999