Search Documents

  • SAIMM
    Chemical And Physical Changes Of Cathode Carbon By Aluminium Electrolysis

    By J. Hop, A. Støre, T. Foosnæs

    The carbon cathode for aluminium electrolysis is also part of the container of the process. In order to understand the behaviour and possible failure of the cathode, detailed material properties under

    Jan 1, 2004

  • AUSIMM
    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Sep 13, 2010

  • SAIMM
    Stability evaluation for Jinping arch dam by using bifurcation model in 3D FEM analysis

    By C. Steve

    ABSTRACT: In this paper, the stability evaluation and bifurcation criteria are presented for the Jinping arch dam structure. The bifurcation models in failure status of the arch dam are derived from t

    Jan 1, 2003

  • CIM
    Mineralogical Evaluation of Au-Sb-As Mineralization from the ADMW Zones, Clarence Stream Property, New Brunswick

    By Louis J. Cabri, Donald Hoy

    "Samples with contrasting gold mineralization were studied quantitatively prior to metallurgical tests. The AD samples are coarser-grained and characterized by abundant Sb minerals (jamesonite, berthi

    Jan 1, 2007

  • SAIMM
    Formation, Characteristics And Utilisation Of Cogas Formed In Ferrochromium Smelting

    By H. Krogerus, P. Niemelä, P. Oikarinen

    High carbon ferrochromium is produced by carbon reduction. No replacement for carbon as reductant has yet been developed. The reduction creates a considerable amount of CO-gas. In open and semi-clos

    Jan 1, 2004

  • NIOSH
    Technology News - No. 487 - Sweeping Compound Application Reduces Dust From Soiled Floors Within Enclosed Operator Cabs

    Objective To reduce dust generated from soiled floors within enclosed operator cabs. Background Enclosed operator cabs are widely used on mobile excavation equipment in the mining and constru

    May 1, 2001

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Effect of Pre-Oxidation and Filtration on Cyanidation of Contaminated Gold from a Flotation Concentrate

    By J T. Woodcock, G J. Sparrow

    A sample of pyrrhotite flotation concentrate pulp assaying 15.3 g/t Au, which had been prepared from an old tailing dump, was treated to extract the gold. Examination of the concentrate with an SEM sh

    Jan 1, 1990

  • SME
    Tunneling Challenges in the Nation?s Capital

    By Moussa Wone

    The Washington, DC Water and Sewer Authority (WASA) has implemented facility planning for the Anacostia River Projects portion of a program to bring its Combined Sewer System (CSO) into compliance wit

    Jan 1, 2008

  • AUSIMM
    Wiring for Start-Up Success

    PIP is regularly engaged in businesses where Greenfield Capital Projects are under- delivering on the expected business case. In most of these projects, we can identify that rigorous review has been c

    Jan 1, 2006

  • NIOSH
    OFR-73-79 Portable Calibrator For DC Circuit Breakers

    By D. A. Paice

    A portable calibrator to check tie trip setting of dc circuit breakers within an accuracy of +5% has been developed for the Bureau of Mines. It operates from a 300 volt dc trolley wire to provide cont

    Jan 1, 1978

  • AUSIMM
    Aeration induced moisture reduction of iron ore

    By J Guo, K Williams, S Caldwell, W Chen

    Mining is increasingly occurring near or below the water table. This has led to a higher rate of handling problems associated with increased moisture and increased adhesion, which lead to a higher rat

    Jul 24, 2017

  • IMMS
    Borehole Mining Of Manganese At Subzero Temperatures

    By Gregory Abramov

    Borehole Mining (BHM), a remotely-operated waterjet mining method (Figure 1), has recently achieved two major milestones. It was, for the first time, applied to the extraction of manganese ore and at

    Jan 1, 2011

  • SAIMM
    Ferro Silicon Operation At IMFA ? A Critical Analysis

    By Dhananjaya Senapati, E. V. S. Uma Maheswar, C. R. Ray

    Carbothermic process of Ferro Silicon production is primarily a slag-less process. However, slag formation is observed in the regular operation as experienced by almost all the Ferro Silicon Producers

    Jan 1, 2007

  • ABM
    Efeito Do Alto Carregamento Nas Características Superficiais Dos Anéis De Pistão Ensaiados Em Diferentes Materiais De Camisa De Cilindro

    By William Lemos Bevilaqua

    No presente trabalho foi avaliado, por meio de ensaios dinamométricos em um motor de combustão interna, o desempenho dos anéis de compressão em diferentes materiais de camisa de cilindro, sob alto reg

    Aug 16, 2017

  • CIM
    Early Age Development of Cemented Paste Backfill

    By D. Simon

    This paper studies the effect of binder type and content on the early age development of cemented paste backfill (CPB). The early age development of the mixtures is analyzed using scanning electron mi

    May 1, 2007

  • SME
    The Price Is Right?Planning Large Water Tunnel Contracts In New York

    By Christian Maguire

    Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure

  • CIM
    The Justification of Process Control Systems in Mineral and Coal Processing Applications

    By R. F. Hochstein, A. J. Neale, B. C. Flintoff

    "Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu

    Jan 1, 1990

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • AUSIMM
    A Geo-Mechanical Assessment of Thick Seam Mining Methods with Regard to Their Application to Australian Black Coals

    By C D. Rawlings

    An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geo-mechanical environment and previous mining history existing in

    Jan 1, 1980