Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sistema De Rejeição Dinâmica De Cargas Da Usina Termelétrica Da Vallourec Tubos Do BrasilBy Cristiano Pedro de Souza
A Vallourec Tubos do Brasil (VBR) possui em sua instalação uma usina Termelétrica (UTE), que utiliza os gases gerados nos altos fornos como combustível principal e gás natural como back-up. A UTE cont
Jul 31, 2018
-
Kalgoorlie Geology Re-InterpretedBy Miller F. S
The famous Golden Mile of Kalgoorlie in Western Australia was, between 1888 and 19ft, one of the richest and most important gold camps in the world. Annual production, which reached a peak of nearly 1
Jan 1, 1937
-
The Role of the Chamber of Minerals and Energy of Western Australia IncThe Chamber of Minerals and Energy of Western Australia Inc (CME) is the peak resources sector representative body in Western Australia. The paper gives a summary of the role and objectives of the CME
Jan 1, 2006
-
Evaluation Of Movement Data And Ground Conditions For The Åknes Rock SlideBy V Kveldsvik, N Ragvin, T Eiken, G Grøneng, G V. Ganerød
Catastrophic rock slope failures have caused destructive tsunamis in Norwegian fjords. At the Åknes rock slope the tsunami generating potential is large due to the potential large volume involved in a
Jan 1, 2006
-
Shaft Excavation Using the Borehole Rising MethodThis paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of
Jan 1, 1959
-
Ventilation: Understanding The Factors Affecting Air Resistance And Their Implications On Mine Operating And Capital CostsBy H. C. Seeber
When considering all the aspects of a viable mine plan, it is important to estimate the accurate cost of mine ventilation, which varies as a function of airway dimensions, fan selection and ventilatio
Jan 1, 2002
-
OFR-33-73 A Seismic Communications Investigation Employing A Piezoelextric TransducerBy Craig C. Johnson
The purpose of this effort was to investigate the feasibility of employing a piezoelectric transducer for seismic communications applications in mine environments. The transducer, a government furnish
Jan 1, 1972
-
The Relation Between Faulting and Mineralization at the Cowarra Gold Mine in New South WalesThe Cowarra gold mine is at latitude 36°O'S. and longitude 149°19'E. which is roughly 20 miles north-north-east of Cooma.The deposit was· originally worked towards the end of
Jan 1, 1965
-
The importance of the shape, orientation and roughness of free faces in commercial blasting operationsBlasts should be designed so as to maximise the percentage of charges which shoot to a free face (Le, to a pronounced rock/air interface).Free faces should be rough, parallel and reasonably near to bl
Jan 1, 1986
-
Minerals Beneficiation - Properties of Heavy LiquidsBy W. L. Connell, O&apos
The properties of some heavy liquids which can be used in sink-float separations are discussed with major emphasis being given to the halogenated hydrocarbons. Data are presented on density, viscosity
Jan 1, 1963
-
An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 mBy Wendy L. Naysmith
This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to
Oct 1, 2010
-
Beneficios del uso de "simuladores" en la mejor continua de las operaciones metalúrgicasBy Francisco Anglade
Dado que la simulación digital es una herramienta auxilar para los ingenieros de procesos -en tanto evalúa la factibilidad de un flowsheet propuesto y predice el efecto de una modificación para un fl
Sep 9, 2007
-
Integrated Maintenance Services at the Los Pelambres Mine in Chile - The Lessons Learnt and Best Practices Developed from a Long-Term Sustainable RelationshipBy L Avalos, F Melo Miranda, J Misle, M Ingwersen
"Los Pelambres, majority owned by the Chilean company Antofagasta Minerals, is one of the leading producers of copper and molybdenum in the country. It is located high in Andes Mountains, over 3000 me
Jul 15, 2013
-
A Peneira Excêntrica Circular Na Classificação Do Minerio De Ferro Com Umidade NaturalBy Oswaldo Delfim
Com o aumento da exportação do minério de ferro para os mercados asiáticos e consequentes novos parâmetros nas especificações, principalmente granulométricas para o minério com maior grau de pureza, v
Aug 16, 2017
-
Implementing Best Practices of Metal Accounting at the Strathcona MillBy Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney
"The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern
Jan 1, 2012
-
The Hydraulic Transportation of SandsFactors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical
Jan 1, 1959
-
The Lithium Industry - Challenges For The Future - IntroductionBy I. A. Kunasz
This paper is not intended to review and re-state general information on lithium, but rather to analyze the paradigm that has caused such a rapid rise in lithium production and the development of new
Jan 1, 2011
-
Control of Mineral Sands Dry PlantBy D Gelling
Mineral sands dry plants consist of a large number of repetitive unit operations with significant transport delays, in the form of stream pipes, conveyors and elevators. As part of the P255 mineral sa
Jan 1, 2001
-
Tecnologia De Reciclagem Para CoprodutosBy Eduardo Cabral
A nova política de resíduos sólidos, imagem positiva da empresa, utilização consciente de recursos com a consequente redução de custos e preservação do meio ambiente têm levado as minerações e siderúr
Aug 16, 2017
-
Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement PileBy Jiwei Duan
The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon
Jan 1, 2002