Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining MethodBy Jin He
Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining
Jan 1, 2006
-
Yield Pillar Applications--Impact On Strata Control And Coal ProductionThis paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?By Elizabeth Holley, Meriel Young, Gabriel Walton
"The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th
Jan 1, 2018
-
Presented at the 25th International Conference on Ground Control in MiningBy David Dye
Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou
Jan 1, 2007
-
International Practice in High Performance Underground Thick Coal Seam Extraction and Related Ground Control ChallengesBy Bruce K. Hebblewhite
This paper provides an overview of the international ?state of the art? with respect to underground coal mining methods used in seams of thickness greater than 4.5 m, through a review of a selection o
Jan 1, 2013
-
Stress Measurements for Safety Decisions in Longwall Coal (4b24fd83-539f-4e52-8928-06b50544afce)By Eric Zahl
Researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health, Spokane, WA, have collaborated with three Western longwall coal mines in an ongoing effort
Jan 1, 2002
-
Investigation of Rock Mass Stability around Tunnels in an Underground Mine in USA by 3-D numerical modelingBy L. A. Sandbak, Yan Xing
"The purpose of this study is to evaluate the rock mass stability around the tunnels by three-dimensional (3-D) numerical modeling. Complex geological and tunnel features have been included in the mod
Jan 1, 2016
-
The Initial Collapse of the Overburden Over Longwall PanelsBy Gennaro Marino
Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing
Jan 1, 1987
-
An Alternative To A Manual Torque Check On Roof BoltsBy Joseph A. Cybulski
In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve
Jan 1, 1990
-
Application of Phenolic Foam in Longwall MiningBy Marc Arl
Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro
Jan 1, 2005
-
Optimization of Chain Pillars Design in Longwall Mining MethodBy Kazem Oraee, Mehran Gholincjad, Navid Hosseini
"Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the
Jan 1, 2010
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984
-
Influence of a Coal Mine Subsidence on An Adjacent DamBy Nengxiong Xu
The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)
Jan 1, 2013
-
Mitigation of Longwall Subsidence Effects on Operating RailroadBy Robert Kimutis, Ke Yang, Yi Luo, Jianwei Cheng
"Surface subsidence processes, especially those associated with a longwall mining operations, could cause operational and/or safety problems to railroads. For railroads with normal amounts of traffic,
Jan 1, 2010
-
Strength and Deformation Characteristics of Coal under Cyclic LoadingBy Yongjie Yang
Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin
Jan 1, 2006
-
Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension ProblemBy Guy Reed, Russell Frith
"Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h
Jan 1, 2017
-
Advancements In Reflective Seismic Tomography For The Location Of Old Works And Characterization Of Structural Anomalies Impacting Underground DevelopmentsBy David R. Hanson
Seismic tomographic imaging, based on the same principles as a medical CAT Scan (Computer-Aided-Tomography). has been used for many years in the oil industry for large-scale subsurface stratigraphic c
Jan 1, 2000
-
Optimizing Drilling Parameters for Improved Bolting Safety and PerformanceBy Darin Cotton, Tim Burgess, Tim Martin
"As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p
Jan 1, 2015
-
Suspension Designs Required in the Logical FrameworkBy Ross W. Seedsman
The logical framework recognises that a coal mine roof can be intrinsically stable or may collapse in one of four ways. Suspension of the immediate roof is one of fundamental ground control strategie
Jan 1, 2014
-
Monitoring Of The Interaction Effects Over A Longwall Panel In The Sydney Coalfield, Nova ScotiaBy Peter Cain
The Phalen Colliery in the Sydney Coalfield is extracting the 2.6 m thick Phalen Seam by the panel and pillar longwall retreat method. Abandoned workings occur in the Harbour Seam 140 m above and over
Jan 1, 1993