Soft Ground Tunneling Issues Handled by Partnering—A Win-Win Project in Rancho Cordova, CaliforniaBy Jack Magtoto, Lysa Voight, Tom Martin, John Forero
SUMMARY Commitment by all parties to partnering goals established early in the contract aided Affholder, Inc. in constructing 2,360m (7,700') of soft ground tunnel in Rancho Cordova, CA. Desp
Jan 1, 2007
-
How To Increase Plant Performance With Artificial Intelligence And Expert Systems - Preprint 09-074By L. B. Hales
Expert control of grinding and flotation plants has been successfully used in the minerals industry since the 1970?s. The earliest of these systems were written in a hard-coded fashion in FORTRAN, BAS
Jan 1, 2009
-
Geochemical Profiling Of A Sulfide Leaching Operation: A Case StudyBy S. M. Flaherty, R. E. Scheffel, A. Guzman
Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me
Jan 1, 2006
-
The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources DevelopmentBy H. Ikeda
INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.
Jan 1, 2001
-
Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006By Paul Zick
The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All
-
Bringing the Entrepreneurial Mindset into Mining Engineering Education (Mining, Metallurgy & Exploration)By Rudrajit Mitra, Erik Hulthén, TOBIAS HARTMANN, ELISABETH CLAUSEN, Aarti Sörensen
There has been an ongoing debate on how to transform engineering education to better prepare students for today`s professional world that is characterized by increasingly complex problems and challeng
May 25, 2022
-
Improving Storage And Handling Of Ores In Mining And Processing OperationsBy Jayant Khambekar
In a typical mining operation, run-of-mine (ROM) ore is crushed and screened to achieve a desired particle size distribution and then fed to processing equipment for further refining. For an operatio
Jan 1, 2009
-
Dynamic Simulation Of Grinding Circuits As An Aid For The Diagnosis Of Hydrocyclone Malfunction - Preprint 09-100By C. Bazin
Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the identi
Jan 1, 2009
-
Estimation Of Capital And Operation Costs Of Backhoe LoadersBy B. Oraee
Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are
Jan 1, 2011
-
Acid Base Accounting: Low-Level Data Comparison Of Net Carbonate Value Versus Modified Sobek Procedures As Described By The State Of NevadaBy T. Patten
Inter-Mountain Labs, IML, performed a study comparing mining waste rock sample analysis by Net Carbonate Value (NCV) and Modified Sobek acid-base accounting procedures. The study looked at 468 waste r
Feb 27, 2013
-
Utilization of Strain Measurements on Shielded Tunnel Boring MachinesBy Brad Murray
Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di
Jan 1, 2008
-
Small Mine Contractor Safety - Case StudiesBy F. Calizaya
The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind
Jan 1, 2008
-
Quartz-Feldspar Separation For The Glass And Ceramics IndustriesBy F. Burat
Large reserves of feldspar ore exist in the Aegean region of Turkey. The main colored impurities in these ores are iron- and titanium-bearing minerals such as anatase, rutile, sphene and ilmenite. In
Jan 1, 2007
-
Towards A General Distribution Model For Flowsheet Design – Preprint 97-165By M. S. Klima, P. T. Luckie
Proper analysis of washabiity data can lead to the development of a maximum yield coal preparation plant flow sheet. Simulations, as simple as spreadsheet mass and water balancing, are important in ex
Feb 24, 1997
-
‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake MineBy Duane A. Smith
They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer
Jan 1, 2003
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
An Approach To Successful Development Of International Mineral ProjectsBy T. L. Owen
Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o
Jan 1, 2000
-
Design And Construction Service Tunnels On Palm Jumeirah IslandBy Ben Hayes, Michael Ryjevski
The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira
Jan 1, 2007
-
Improving Truck-Shovel Energy Efficiency Through Discrete Event ModelingBy K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
-
Middle Rouge Parkway Interceptor Extension—A Case HistoryBy Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in