Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Collection Of Geotechnical Parameters From Downhole Geophysical Methods: A Cost Effective AlternativeBy W. Hitchcock
To enable the analysis of stability for a mine feasibility study a variety of geotechnical engineering parameters need to be obtained. At the early stage of a project it is usual for those responsible
Jan 1, 1999
-
The Million Dollar Grinding Mill - Is It For You?By Vas P. Srinivasa
A comminution circuit is an important integral part of a mineral processing plant. Nearly 40% of the capital cost and 30 to 40% of the operating cost are taken up by the crushing and grinding circuit.
Jan 1, 1983
-
Operation Of The Grate-Kiln System At Humboldt IntroductionBy Dan Urich
This paper covers the construction and operation of the Grate-Kiln system at the Humboldt Mine. The mine concentrator and pellet plant are located approximately 14 miles West of Ishpeming, Michig
Jan 1, 1962
-
Reduction or Elimination of Abrasion, Wear, and Corrosion in Backfill EquipmentBy Franz Albert Nonnen
Backfill systems have been used for as long as mining activities have existed. Various backfill methods have been developed over the centuries with consideration for geological necessities, the techni
Jan 1, 2001
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007By W. D. Monaghan
Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha
Jan 1, 2009
-
Vale Inco?s international search to curtail diesel emissionsBy J. S. Stachulak
The Diesel Emissions Evaluation Program (DEEP), a research consortium formed in 1997 by Canadian mining companies, labour unions, and provincial and federal government departments, completed its work
Jan 1, 2009
-
Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving DataBy Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami
For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve
Jan 1, 2007
-
Application Of Impact Resistant Steel Sets For Underground Roof Fall RehabilitationBy J. C. Stankus
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c
Jan 1, 2011
-
Environmental Management At Homestake Mclaughlin Mine (PREPRINT 90-23)By R. E. Krauss
The McLaughlin Mine is a world class epithermal gold deposit located in the coastal thrust fault of Northern California, U.S.A. Homestake adopted a proactive strategy in the permitting of the Mine. Ex
Jan 1, 1990
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Recovery of Gold from Shanono Gold Ore Deposit Using α-Cyclodextrin "Mining, Metallurgy & Exploration (2020)"By A. M. Anthony, A. Y. Atta, S. S. Magaji, U. Abubakar-Zaria
There are two major gold recovery methods: the hydrometallurgical technique, which employs cyanide solutions, and amalgamation method, which involves mercury (Hg). These methods present considerable h
May 5, 2020
-
Methods Of Providing Reliable Data For Coal Preparation Plant DesignBy Frank Pollard
The Australian coal industry over recent years has experienced the situation whereby exploration and mine development are moving into geographical areas where the coal seams have never been mined to a
Jan 1, 1981
-
Preliminary Evaluation Of The Effect Of Coal Cleaning On Trace Element RemovalBy Charles T. Ford
In 1971, Bituminous Coal Research, Inc~ established a program to provide the coal industry with the necessary information and technical capability to investigate and evaluate potential problems concer
Jan 1, 1977
-
A Novel Approach in Predicting Dump Truck Tyre Life in a Mine Based on Multilayer Perceptron Neural Network Optimised with Particle Swarm Optimisation - Mining, Metallurgy & Exploration (2024)By Yao Yevenyo Ziggah, Victor Amoako Temeng, Solomon Evans Kweku Koomson
Tyre hours/life deficit is a major operational challenge facing the mining industry which adversely affects materials production and costs. An accurate forecast of the tyre life is key in addressing t
Mar 11, 2024
-
Coal And The Energy CrisisBy V. M. Johnston
The most abundant fuel resource in the U.S.A. is also the most under-utilized. Proven reserves of bituminous coal, sub-bituminous and lignite constitute from 60% to 90% of our total fossil fuel reserv
Jan 1, 1973
-
Quantitative Criterion and Applications for Assessing the Impact of Coal Seam Mining on Overlying Strata - Mining, Metallurgy & Exploration (2024)By Lingyun Zou, Xinghai Lei, Tiezheng Li, Yifei Song, Nan Wang, Yang Li
The stability of key strata is of utmost importance in ensuring safe and effective coal seam mining operations. To minimize disturbance impacts on these strata and ensure their stability, it is crucia
Mar 8, 2024
-
Molecular Gate® Adsorption System For The Removal Of Carbon Dioxide And / Or Nitrogen From Coalbed And Coal Mine MethaneBy Micheal Mitariten
The recovery of natural gas (primarily methane) from coalbed deposits is an established and growing source for the U.S and accounts for over 7% of its total production. The gas from on-purpose degass
Jan 1, 2005
-
M&E Research Symposium ? Mining Research in ProgressBy Evan Just
?We are certain there is need for research in every phase of mining." This statement by R. M. Crump of the Jones and Laughlin Steel Company (047) paraphrases opinion widespread among mining people.
Jan 1, 1961
-
Dry Chemical Process To Magnetize Pyrite And Ash For Removal From CoalBy James K. Kindig
Hazen Research, Inc., has developed a new process for removing pyritic sulfur and ash from coal. Feed coal is contacted with iron carbonyl vapors, Fe(CO)5, at 190°C which puts a thin skin of magnetic
Jan 1, 1976