    Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

    By L. L. Lacerda, A. J. Blair

    The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double

    Jan 1, 2005

  • SME
    Geochemistry of ilmenites in heavy mineral sand deposits from Southwestern India: A source to beach case study

    By Felicity Lloyd, Stuart Kearns, Roger McLimans

    The metamorphic terrane of southwestern India is a geological environment containing ilmenite source-rocks, transport drainage systems, and resultant beach sand deposits that contain altered ilmenites

    Jan 1, 2005

  • SME
    Hydrocyclone Modelling: Large Eddy Simulation CFD Approach

    By Jose A. Delgadillo

    The hydrocyclone problem has been a challenging task for the last 30 years. In the 80’s and 90’s Computational Fluid Dynamics solution to this problem began to appear. These were unsuccessful due to o

    Jan 1, 2005

  • SME
    Mystery Of The Missing Grade And Recovery

    By S. Ripke

    Between 2002 and 2004, the performance of a six million ton per year iron ore beneficiation plant dropped significantly. In a classic case of “who done it,” was it the mine, the concentrator, an ore c

    Jan 1, 2007

  • SME
    An Assessment Of Engineering Noise Controls At A Talc Processing Plant

    By E. R. Spencer

    National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi

    Jan 1, 2008

  • SME
    Mine Roof Truss Support Systems Technology

    By R. M. Cox

    The ground forces generated by a properly installed and tensioned mine roof truss assembly can provide permanent mine roof support, even in severe ground conditions, either by direct suspension of the

    Jan 1, 2002

  • SME
    Challenges and Opportunity in Modelling and Simulation of Mineral Processing Systems

    By K. V. S. Sastry, K. D. Lofftus

    Mathematical modeling and computer simulation are two valuable quantitative tools that are being effectively applied to mineral process- systems. This paper presents an up-to-date assessment of proces

    Jan 1, 1989

  • SME
    A New Packed Column Flotation System

    By David C. Yang

    A packed column (or static tube) flotation system is an innovative technology which utilizes a controlled dispersion reagent scheme and a new machine. The unique aspect of the machine is its packed-be

    Jan 1, 1988

  • SME
    Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero Emissions

    By Tuncel M. Yegulalp, Anuta Belova

    This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu

    Jan 1, 2005

  • SME
    Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear Programming

    By L. Clark

    Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres

    Jan 1, 2007

  • SME
    Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case Study

    By D. Drymonitis, G. Gialoglou

    "Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a

    Jan 1, 2005

  • SME
    Pushing The Limits Of Gravity Separation

    By Claude Deveau, Stephen R. Young

    Introduction Tanco History Tanco is sometimes known as the Bernic Lake Mine. It is located about 180 km east-northeast of Winnipeg close to the Manitoba-Ontario boundary. Tanco operates an undergr

    Jan 1, 2005

  • SME
    Evaluation Of Capillary Rise Methods For Determining Wettability Of Powders (5db810bc-2051-4544-80b4-3fdee5f4e379)

    By R. L. Wolfrom, R. Hogg, S. Chander

    A gravimetric method for measuring rates of capillary rise in powders was explored. Methods to improve reproducibility and consistency of the results were investigated. In particular, the effects of

    Jan 1, 2002

  • SME
    Effects of ventilation and gob characteristics on spontaneous heating in longwall gob areas

    By L. Yuan

    In the U.S. coal mining industry, most spontaneous combustion fires occur in longwall or worked-out gob areas. In order to reduce the fire hazard caused by spontaneous combustion, it is important to u

    Jan 1, 2009

  • SME
    Initial Support Design for Tunnels in Horizontally Bedded Sedimentary Rock

    By Irwan S. Halim

    For tunnels in horizontally bedded rock, geologic factors affect the selection and design of the initial supports, including the rock propensity toward parting along bedding and the resulting high pot

    Jan 1, 2008

  • SME
    Drive Options For Belt and Apron Feeders

    By Laszlo Toth

    A feeder is used to control the gravity flow of bulk solids from storage areas, like a bin or a stockpile. For this type of application, it is important to select a proper drive that can fulfill all

    Jan 1, 2003

  • SME
    How Safe Are Your Recent Mills? The Compatibility Between FEA And Welding Codes

    By V. Svalbonas, M. Fresko

    The present versions of the Welding Codes, such as BS7608, have long been known to be compatible with hand computations of membrane and bending stress, rather than detailed finite element solutions.

    Jan 1, 2002

  • SME
    New Developments In The Recovery Of Manganese From Lower Grade Resources

    By N. Chow

    The recovery of manganese from lower grade resources has been studied for a number of years. Of key importance of prior work, was the discovery that higher valent manganese resource can be readily lea

    Jan 1, 2011

  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • SME
    Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas

    By Greg Wieland

    Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.

    Jan 1, 2008