Copper Exchange Capacity of Clays and the Effect of Competing Ions on in situ Copper LeachingBy Y. Topkaya, R. E. Johnson, B. R. Palmer, R. B. Bhappu, A. E. Clark, R. P. Bush, L. E. Schultze
The U.S. Bureau of Mines conducted copper exchange capacity (CuEC) tests for six common clays under simulated in situ leaching conditions. Regression equations were obtained from the data expressing t
Jan 1, 1993
-
Compression-Yield Roof Support Concept Using a New Yieldable Steel PropBy Ben L. Seegmiller
The basic compression-yield concept of roof support for mine roadways requires that the mine roof be placed in a state of compressive stress. The compressive stress may be achieved using a support sys
Jan 1, 1992
-
Technical And Economic Aspects Of Rapid Shaft Construction With A V-MoleBy Ronald B. Gabitzsch, Norbert P. Hanke
During 1982, record advances have been achieved in the excavation of vertical shafts with a V-Mole (a vertical shaft boring machine). The V-Mole, supplied by Wirth GmbH in Erkelenz, West Germany, h
Jan 1, 1983
-
Identical Joints Artificially Produced in Real RockBy R. W. Hutson
One of the fundamental precepts of experimentation is the isolation of a single variable to quantify its individual effect. Unfortunately, the variability of natural rock joints has frustrated such is
Jan 1, 1986
-
Shotcreting, Concreting at Climax Molybdenum’s Henderson MineBy Dave Watson
Henderson Mine personnel have more than 20 years experience and have placed more than 400,000 m3 (520,000 cu yd) of shotcrete and concrete. Over the last 20 years, the mine has used a variety of equip
Jan 1, 1992
-
The Plate-And-Bar Model Of Rock Mass In Cooper Ore Exploitation DesigningBy Jan Walaszczyk
The paper concerns the calculation of stresses and displacements in working area of room-and-pillar mining system of cooper ore mines. A three-dimensional rock mass model based on the finite element m
Jan 1, 1992
-
Pit Limit Analysis - Some Observations On Its UseBy John T. Crawford
Open pit limit analysis techniques of various types have been utilized for many years to design ultimate pit surfaces. In the last 15 years there have been many advances in the development of sophisti
Jan 1, 1979
-
Increasing Throughput at Paddy's Flat - Exploiting the Properties of the OreBy Gary Johnson, Bill Mackenzie
The Paddy's Flat plant of Dominion Mining Limited was commissioned in March 1988 with a design throughput rate of 700,000 tpa. The plant now treats ore at an annualised rate of over 2,000,000 tpa. The
Jan 1, 1992
-
Cost Saving Initiatives - Boddington Gold MineBy Malcolm Wills
Boddington Gold Mine commenced operation in 1987 with an initial production of 3.0 Mt/y at a grade of 3.5 git. Head grade has reduced over the life of the mine and the major response to the drop in gr
Jan 1, 2000
-
Refractory Gold Ores - Factors Affecting Process SelectionBy David Lunt, Evan Kirby, Peter Mason, Ian Ritchie
The treatment of refractory gold ores, in particular the "competing" technologies and their relative advantages and economics, has become a major segment of most mineral technology oriented conference
Jan 1, 1995
-
Geoeconomics Education in The Soviet UnionBy Vitaly T. Borisovich
Mining economics courses have been taught in Europe for more than two centuries and in the United States for most of this century. They are the mineral industry's version of engineering economics
Jan 1, 1991
-
The New Ventilation Standards As They Apply To Spontaneous Combustion ControlBy Thomas E. McNider
On July 20, 1990, a Spontaneous Combustion Control Plan was approved by MSHA for Jim Walter Resources, Inc. No. 5 Mine. The mine operated under the plan for twenty-nine shifts before MSHA revoked the
Jan 1, 1993
-
Reporting On Product Stewardship In The Copper IndustryAt present, increasing focus of public perception is placed on the environmental and social benefits, risks and impacts of metals and metal-bearing products. To address these issues, the concept of pr
Jan 1, 2003
-
Metallurgical Development Since 1982 at Phelps Dodge’s Ojos del Salado Concentrator in ChileBy Wiston Rocher
The Minera Ojos Del Salado (MINOSAL) concentrator is located 20 km (12 miles) southeast of Copiapo, Chile. It processes copper ore provided by its Santos and Resguardo mines at a capacity of 4.2 kt/d
Jan 1, 1993
-
Ground Control Simulation During Longwall Mining - IntroductionBy C. Haycocks
In spite of the increasingly high capital investment required for longwall mining equipment, there continues to be a steady trend towards this form of mining. This move is caused in large part by impr
Jan 1, 1979
-
Diffraction Imaging Using Cross-Borehole Seismics: A Physical Model StudyBy A. H. Balch
A physical elastic seismic model, based on the Peoria oil field was constructed and used to produce multi mode cross-borehole seismic data. Because this was a physical model, it was necessary to deal
Jan 1, 1993
-
A New Development in Microcomputer Software for Mine Ventilation Planning Involving the Installation of FansBy Martha S. J. Leary, Malcolm J. McPhersqn
This paper introduces a computer simulation which extends the utilization of microcomputer systems for mine ventilation planning. The program was developed as part of an ongoing study to produce a sim
Jan 1, 1988
-
Evaluation Of Progressive Rib Failure In Thick Coal SeamsBy W. C. Smith
Even with the most conservative mine plan, rib instability can occur unexpectedly, and if not adequately dealt with, can progress from a nuisance to a major safety hazard. This Bureau of Mines paper e
Jan 1, 1989
-
Injury Experience Analysis For Risk Assessment And Safety EvaluationBy R. V. Ramani, R. Natarajan, A. Bhattacherjee
Industries in general, and mining in particular, have become safer than ever before. However, there is a need to increase the search for the causes of mining work-related injuries and to contribute to
Jan 1, 1993
-
A Primer For Engineering And Technical Professionals Regarding Reclamation And Environmental Surety BondsBy W. T. Gorton
Bonds are required by state and federal law to address reclamation when the permittee defaults. Under various principles of law, a bonding company may propose to perform the obligations of the permit
Jan 1, 2003