Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Journal: 20th Annual Photo and Art Contest, Honorable Mention, "Basic Blasting Class at Missouri S&T Underground Blasting Lab"By Paul Worsey, Gillian Worsey
Description of Project:The basic blasting class underground lab at the Missouri S&T experimental mine in Rolla, o., shows the students how to drill, set up, load, and shoot a shot underground. In this
Jan 1, 2014
-
Post Blast Analysis in Coal MiningBy Geoff Baldwin, Alastair C. Torrance
The use of monitors to assess equipment performance is carried out on a routine basis in many industries. The benefits gained through process control in knowing exactly how the equipment is working fa
Jan 1, 1990
-
Benefits of Drill Improvement TeamsBy Miles Huntly
This paper will discuss the ideas and actions that led to the development of a Drill Improvement Team at an open cut coal mine in Australia. It will show significant cost savings can be attained by fo
Jan 1, 1999
-
Blast Spillover ControlBy Jonathan Heiner
Rio Tinto Bingham Canyon Mine started its South Wall Push Back (SPB) in 2011. This push back will mine through the only road to the pit bottom (the 10%). The pit bottom is the main ore sector for th
Jan 1, 2019
-
Computational Fluid Dynamics (CFD) Versus Traditional Methodologies to Assess Airblast from BlastingBy Estefania Aramayo, Jhon Silva, Todor Petrov
Blasting is one of the most critical activities in a mining operation. Nowadays, many quarries have to follow a considerable quantity of environmental restrictions that drive the need to improve the c
Feb 6, 2023
-
Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (f7227bf9-6568-4211-b2c2-9f028c1f10ec)By T Michael LeBlanc
Drill trajectory deviation is a recurring problem in vertical retreat stoping operations. As a result of this deviation, 60 kilogram (165 millimetre diameter) and 103 kilogram (302 millimetre diameter
Jan 1, 1996
-
Blast Damage Control During Underground MiningTracer blasting is commonly used in Canadian underground mines for overbreak control. It involves tracing a column of ANFO with a low strength detonating cord. In order to investigate the effectivenes
Jan 1, 1994
-
Blast Design Methodology for Surface Mines: An Integrated Approach to Optimization - Part 1By G. R. Adhikari
A major part of mineral production comes from surface mining and there has been a rapid growth in this sector with the deployment of high capacity equipment. The importance of blast design combining a
Jan 1, 2002
-
A Blasting-induced vibration control approach for resuming blasting activity near tailing dams in the Quadrilátero Ferrifero region after “Brumadinho Dam Colapse”.By Marcus Neves, Eventomar Junior, Adilson Castro, Leandro Silveira, Sérgio Augusto
The collapse of the Vale S.A. mining tailings dam in 2019, a tragic event that shook Brazil and the world, had consequences that transcended the immediate pain and devastation. Among them, the suspens
Jan 21, 2025
-
Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit PumpBy Stuart Brashear, Steven Bell, Donald Smith
This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede
Jan 21, 2025
-
A Decade of Blasting at Martin Marietta CementBy J T. Keim
Members and guests of the Society of Explosive Engineers, it's indeed a pleasure for a longtime practical user such as myself to have the ears of so many explosive experts for a few minutes just to ex
Jan 1, 1978
-
Quality: a New Approach to Improve Blasting SafetyBy John C. Brulia
Blasting is both an art and a science with the primary objectives being safety and performance. Safety, the paramount objective, is a process that has limitless opportunities for improvement. Quality,
Jan 1, 1993
-
Insitu Land Blasting The Central Artery/Third Harbor Tunnel Project Boston, MassachusettsBy Larry Mirabelli, Gerard J. O'Brien
"The construction of the Third Harbor Tunnel is a key element of the Central Artery TunnelProject. The tunnel is to traverse Boston Harbor directly linking South Boston to EastBoston. The tunnel is a
Jan 1, 1993
-
Modern Blast Engineering to Improve Mine ProfitabilityBy Josh Campbell
Modern blast engineering involves the use of modern technology to provide more efficient blasts. Through the use of improved measurement techniques more information can be obtained on many of the phys
Jan 1, 1998
-
Silently Controlling Cracking TechnologyBy Guang-Xin Li, Rui-Ping Guo
Based on the analysis of factors affecting the cracking performance of Silently Cracking Agent (SCA), a new SCA structural model is built and a study on the swelling mechanism of SCA and a method to i
Jan 1, 2000
-
Blasting Damage Criteria for Low-Rise StructuresBy Kenneth Medearis
There is considerable evidence that more rational damage criteria need to be generated with regard to low-rise structures subjected to blasting vibrations. There is not sufficient basis for specifying
Jan 1, 1978
-
Development and Field-Test of Low Density ANFOBy S. Nakamura, H. Taniguchi, K. Noguchi, H. Sugihara, T. Matsuzawa
It has been reported that expanded poIystyrene and ANFO prills ‘were mixed on a blasting site for controlled blasting (ISANOL). Although there seems to be few possibility of their segregation because
Jan 1, 2001
-
An Analysis of Firing Time Scatter Effects on Vibration Simulations from Waveforms with Low and High Frequency ComponentsBy Randall M. Wheeler
Many blasting companies are using simulated production ground vibration waveforms to aid them in the control of their vibration effects. The simulations are typically produced by using a seismograph t
Jan 1, 1991
-
Seismic Study of the Dynamic Response of Rock to Cylindrical Charges Fired in a Half and a Quarter Space GeometryBy Sharon K. Reamer, Klaus G. Hinzen
A series of controlled seismic experiments was performed in a limestone quarry in southern Germany to study seismic effects of cylindrical charges fired in both a half space (HS) (burden 63 m) and qua
Jan 1, 1991
-
The Effect of Explosive Type and Delay Between Rows on FragmentationBy Mark S. Stagg, Rolfe E. Otterness, Stephen A. Rholl
The Bureau of Mines fired seven test blasts in a 22-ft bench of limestone, screening the material to investigate the influence of explosive type and between row delays on fragmentation. Four 4-hole, s
Jan 1, 1989