    Numerical Simulation of Fragmentation During the Throw Stage of Blasting

    By C H. Ryu

    This paper presents a simplified two-dimensional numerical model of block fragmentation in a Jointed rock mass during the late or throw stage of a blast after wave effects have subsided. The model is

    Jan 1, 1986

  • ISEE
    Source Scaling of Single-Fired and Delay-Fired Explosions Constrained by In-Mine and Regional Seismograms

    By Brian Stump, D. Craig Pearson

    This work quantifies seismic coupling as a function of charge weight for single-fired (simultaneously detonated) explosions observed in the mine and at regional distances. These single-fired explosion

    Jan 1, 2002

  • ISEE
    Blasting and Excavating on Precarious Rock Slopes

    There is an intuitive tendency to equate rock strength with rock stability, yet the two must be evaluated separately. A slope in strong hard rock is not necessarily stable, nor is a slope in weathered

    Jan 1, 1996

  • ISEE
    Electrical Current Requirements in Tunnel Blasting

    By Deane Boddorff

    A 440 Volt AC power line is a typical power source for energizing electric blasting cap circuits in driving hard rock tunnels. A common misconception exists that the caps actually see 440 Volts. This

    Jan 1, 1975

  • ISEE
    Bulk Explosives Test Work at Duvha Opencast

    By T Davids, O J. Jordaan, M D. J Bonneau

    As in most other parts of the world, the surface coal mining industry in South Africa is introducing emulsion explosives as the primary bulk blasting agent for use in wet borehole conditions where AN/

    Jan 1, 1987

  • ISEE
    Case Study - Pumpable Emulsion Trials in Tunneling and Stoping

    By Eduardo Berger

    This paper describes a mechanized loading system, the HYDRODOSE, which allows the use of pumpable emulsions in underground mining. It also describes a pumpable emulsion explosive for small diameter ho

    Jan 1, 1991

  • ISEE
    Underground Central Blast System Electric on Nonelectric

    By J R. "Dick" Daniel

    In the fall of 1988, The Cannon mine decided to investigate a central blasting system based on conventional electric blasting detonators being used to initiate rounds primed with Nonel detonators. The

    Jan 1, 1989

  • ISEE
    Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show Cave

    By Paul Worsey, Gerald Rupert, Mark Kirkbride

    The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically

    Jan 1, 1997

  • ISEE
    Blasting in Tunneling

    By Midori Sakamoto, Nobuaki Sakuma, Tsuyoshi Murashita

    Recently, tunnel blasting works near the residential area and existing building are increasing and environmental problems caused by vibration have become serious public concern. In order to solve thes

    Jan 1, 1998

  • ISEE
    1 January 2003 : Deadline for meeting legal requirements relating to the sale of explosives in the European Union

    By R. K. Wharton

    A European Directive requires that an explosive which is sold or transported within Europe must meet certain essential safety requirements from 1 January 2003. The assessment and certification of such

    Jan 1, 2002

  • ISEE
    Borehole Deviation Study in a Long-Hole Stope

    By Paul Miller, Rene Laprade

    Does a 76 mm Ø hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initia

    Jan 1, 1998

  • ISEE
    Blasting at the Valdez Creek Placer Mine, a Cost Savings Design for Sub Arctic Conditions

    By William E. Hill

    The blasting program at the Valdez Creek Placer Mine must deal with challenging situations throughout the year. During the short summer, extreme water conditions must be confronted, while the winter m

    Jan 1, 1994

  • ISEE
    Oxygen Balanced Emulsion-ANFO Blends for Use in Flammable Atmospheres

    By Michael J. Sapko, Eric S. Weiss

    The U.S. Bureau of Mines has been conducting research on the secondary explosion hazards associated with the mining of oil shale under gassy mine conditions. Explosive incendivity tests have been cond

    Jan 1, 1990

  • ISEE
    Blasting a Very Big Boulder Under Adverse Conditions

    By Brad Johnson

    Homestake Mining Corporations' open cut operation at Lead SD. experienced a highwall failure in October of 1993. The failure released a 75' section of rock wall at the 5280' level. It came to rest on

    Jan 1, 1995

  • ISEE
    Computer Aided Blast Design for Tunnels

    By J L. Jethwa, A G. Gaithankar

    The paper deals with a software method developed to design the optimum blast parameters for tunnels and mine roadways for a given set of geo-mining condition without any major discontinuity. The appli

    Jan 1, 1993

  • ISEE
    The Engineering Significance of Shrinkage and Swelling Soils in Blast Damage Investigations

    By Wendell W. Harris, Stanley J. Vitton

    In the United States each year it has been estimated that expansive soils cause approximately $9.0 billion in damage to buildings, roads, airports, and other facilities. This figure alone exceeds the

    Jan 1, 1996

  • ISEE
    Dynamic Analysis of Highway Structures to Blast Excitation

    By Douglas Lindsey, Glenn Hazen, Shad Sargand

    "With the innovation of computational equipment, an exact analysis of structures as dynamic systems is more approachable. Accordingly, the dynamic system can be established, if the natural characteris

    Jan 1, 1993

  • ISEE
    The Evaluation of Cast Blasting in the Warrior Coal Basin Using High-Speed Photography

    By Tom Burleson

    High-speed photography has proven to be an extremely valuable tool for the evaluation of blasting practices in the Warrior Coal Basin. A research project, coordinated by Nelson Brothers Inc. and The U

    Jan 1, 1988

  • ISEE
    PPV Management and Frequency Shifting in Soft Ground near Highwalls to Reduce Blast Damage

    By Shawn Kirkpatrick, Yang Ruilin, Tamara Whitaker

    In order to manage blast vibration in soft ground containing large diameter holes and large charge weights, a number of issues must be considered. This paper describes techniques to control and reduce

    Jan 1, 2009

  • ISEE
    The Pioneer Use of ANFO in Small Boreholes

    By Raymond V. Adolphson

    The introduction of a new explosive component in 1955-56, called ANFO, featured much safer, effective blasting characteristics when compared to dynamite, accompanied by a notable reduction in cost. Th