Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Ultimate Uplift Capacity Of Piles And Pile Groups In Granular Soil

    By B. M. Das

    Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,

    Jan 1, 1989

  • DFI
    Performance Of Three Unique Shoring Sections For Block 75 Shoring

    By Chris Sammon

    The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet

    Jan 1, 2010

  • DFI
    Deep Foundation Construction Using "Top/Down" Building Techniques In The United States

    By David C. Lager

    While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d

    Jan 1, 1987

  • DFI
    Digitalization in Reverse Circulation Drill Rigs

    By N. Schmitz

    This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem

    Sep 8, 2021

  • DFI
    Case History: Multiple Axial Statnamic Tests On A Drilled Shaft Embedded In Shale

    By Paul J. Axtell

    Two new railroad bridges in Kansas City, Missouri are founded on drilled shafts embedded into the soil and underlying shale. The uncertainty arising from the non-homogeneous, anisotropic nature of mo

    Jan 1, 2006

  • DFI
    Cost Effective Drilling Of Extra Large [XL] Monopile Foundations

    By Phil Wilkinson, Sam Whitaker

    "The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo

    Jan 1, 2017

  • DFI
    Jet Grouting As Soil Improvement In Southeast Florida

    By Evelio N. Horta

    The influence of soil improvement replacement area in foundation settlements is discussed for soil improvement methods used in Southeast Florida. A 3D Finite element analysis is used for two typical c

    Jan 1, 2007

  • DFI
    Enhancements To The FHWA Deep Foundation Load Test Database

    By Carl D. Ealy

    Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan

    Jan 1, 2002

  • DFI
    Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.

    By Peter O. Wilkinson

    Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a

    Jan 1, 2006

  • DFI
    Vertically Loaded Piles In Sand Subjected To Triangular Profiles Of Soil Movements

    By W. D. Guo

    With an experimental apparatus developed recently, model tests on piles were conducted in sand subjected to triangular soil movement profiles. Four instrumented piles tests are reported, which show th

    Jan 1, 2006

  • DFI
    Analysis Of Static And Dynamic Horizontal Load Tests On Steel Pipe Piles

    By Pastsakom Kitiyodom

    In order to estimate the deformation and load distribution of a single pile subjected to dynamic horizontal load as well as vertical load, a simplified method of three-dimensional numerical analysis,

    Jan 1, 2006

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • DFI
    Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description

    By Daniel J. Rider

    In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from

    Jan 1, 1987

  • DFI
    Innovative Application Of Piled Raft Foundation To Optimize The Design Of High-Rise Buildings And Bridge Foundations

    By Y. El-Mossallamy

    The piled raft foundation was extensive applied in the last two decades in different soil conditions e.g. in soft to stiff clay as well as in medium to dense sand and even in highly weathered rock. Th

    Jan 1, 2006

  • DFI
    On Driven Piles In Coralline Deposits: A Selected Case From The Red Sea Coast Of Saudu Arabia

    By Waddah Akili

    At an offshore site along the Red Sea coast of Saudi Arabia, marine structures were supported on tubular steel piles driven into coral and coral contaminated sands and silts. Surprises and disappointm

  • DFI
    The Effect Of Overburden On Pile Capacity In A Calcareous Marl

    By William M. Camp

    An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet

    Jan 1, 1993

  • DFI
    The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid (cdc8479e-b761-4427-8d26-4088be3d5ab5)

    By Ping Yang, Tian-bin Li, Min-hui Wu

    "The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of

    Jan 1, 2017

  • DFI
    Aspects of Standardization for Piles in Europe

    By Roger Frank

    "Abstract After noting the importance of standardization for piles, the European system is described (execution, tests and design, etc.). Some important aspects of Eurocode 7 are outlined (like the ro

    Jan 1, 2014

  • DFI
    Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

    By J. Nakayama

    For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper

    Jan 1, 1999

  • DFI
    St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead Retrieval

    By Peter McDonald

    In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl

    Jan 1, 1997