Business Benefits Of An Integrated CFA Rig Instrumentation SystemBy Jason N. Scott
CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi
Jan 1, 2006
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The EurocodesBy Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Driven PilesBy S. Merjan
Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf
Jan 1, 1991
-
A New Method Of Analysis Of Pile Displacement In Soil With Respect To TimeBy M. England
A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri
Jan 1, 1993
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
The Quality Control Of Pile Foundations Of Tall Buildings In ShenzhenBy Li Keqiang
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on
Jan 1, 1991
-
The Design And Formation Of Bored Displacement Piles - A United Kingdom PerspectiveBy David J. Baxter
Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo
Jan 1, 2006
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - SynopsisBy Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? SynopsisBy B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010
-
Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical ProblemsBy Maurizio Siepi
The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w
Jan 1, 2002
-
Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against LiquefactionBy Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa
"Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me
Jan 1, 2014
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - SynopsisBy A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Water Tightness Of Diaphragm WallsBy Radianto Elprama
For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct
Jan 1, 2006
-
Use Of Micropiles And Soil Nail Piles In State Of California Earthquake Retrofit Project No.#569 - Deep Foundations Institute Seattle, Washingon October 7-9, 1998By Ron Bromenschenkel
The State of California, Department of Transportation is currently retrofitting a major interchange near the San Francisco area. The project is located in a highly traveled area of Oakland with light
Jan 1, 1998
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Retrofitting Drainage Systems with Pressed-in Sheet Piles in Very Hard Soil in Southern CaliforniaBy Takefumi Takuma, Masashi Nagano, Christopher DellAringa
Multiple agencies in Southern California are retrofitting and upgrading their levees to catch up with ever-advancing urbanization affecting the requirements for existing channels and levees in this se
Jan 1, 2018
-
Underpinning With Steel Pipe PilesBy Pasi Korkeakoski
There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and
Jan 1, 2000
-
-
Information Construction Technology For Supported Excavation In Urban ConstructionBy Sun Jiale
This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application
Jan 1, 1991