Settlement Behaviour Of Pile Foundation ? SynopsisBy W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Mini-Piling And Soil Anchors ? IntroductionBy Martin C. Jones
This paper outlines the development of small diameter grouted piling, to deal with foundation problems in difficult soils conditions and in very restricted access areas. A number of applications are o
Jan 1, 1987
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Innovative Methods for Underground Parking in Central CitiesBy Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu
"Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni
Jan 1, 2017
-
Foundation Retrofitting Using Micropiles - A Case HistoryBy Mohammad Nasim
Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a
Jan 1, 2008
-
Lateral Performance Of Two-Section Helical Piles In Soft SoilsBy Mohammed Sakr
A Two-Section Helical Pile (TSHP) is a steel pipe with two shaft sections of different diameters and with one or more helix plates near the bottom of each shaft section. TSHPs are used regularly in we
Jan 1, 2009
-
Challenge From Foundation Engineering To China ? SynopsisBy R. L. Xu
In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output
Jan 1, 2010
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Ground Water Control In The Urban Environment - IntroductionBy Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Piles In Peat Under Artesian Pressure: A Case Study ? SynopsisBy K. Y. C. Chung
A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga
Jan 1, 2010
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - SummaryBy Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And IrelandBy Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And SuccessesBy John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
Uplift Micropile Load Transfer In Unsaturated Missoula Flood DepositsBy John N. Cunningham
Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th
Jan 1, 2011
-
Man - Organisation - Technology - Proposals For Optimising Preventive WorkBy Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
A Review Of Typical Foundations Used In The City Of Cleveland, OHBy David V. Lewin
Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On
Jan 1, 1985
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996