    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • DFI
    EFFC-DFI Geotechnical Carbon Calculator Project

    By Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa

    "Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for

    Jan 1, 2014

  • DFI
    Data Normalization and User Interface Design for the Nevada Department of Transportation Deep Foundation Load Test Database

    By Austin Metz, Kevin Stanton, Ramin Motamed

    "A recent study calibrated Load and Resistance Factor Design (LRFD) resistance factors for local soil conditions in the Las Vegas Valley. As a part of this calibration, an extensive database of drille

    Jan 1, 2017

  • DFI
    Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge

    By Mohammad Eslami

    The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway

    Jan 1, 2010

  • DFI
    Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro

    By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani

    "CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t

    Jan 1, 2017

  • DFI
    Deep Excavation Retaining Systems In Unsaturated Soils

    By Tariq B. Hamid

    Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav

    Jan 1, 2006

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • DFI
    Cyclic Degradation Of Pile Foundations For Offshore Wind Turbines

    By Fabian Kirsch

    Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load

    Jan 1, 2011

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Underwater Concrete - Mix Design And Construction Practices

    By Sam X. Yao

    The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde

    Jan 1, 2013