Load Testing MethodsThis Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa
Jan 1, 2004
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan
The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due
Sep 1, 2022
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case StudyBy Balasubramani M., Ramana P. V., Bairagi K.
This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the
Nov 1, 2022
-
Pile Design Philosophies For Coralline And Weak Carbonate RocksBy Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar
Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks
Sep 1, 2022
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CABy Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
A Summary of Load Test Results on Large Diameter Open-Ended Pipe Piles in MinnesotaBy Rich A. Lamb, Paul J. Axtell, Michael K. Muchard
"Since 2010, the Minnesota Department of Transportation (MnDOT) has performed eight full-scale compressive load tests on large-diameter pipe piles at four different project locations across the state.
Jan 1, 2017
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage StructuresBy Ramanathan C, Prasad P. V. S. R
The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph