Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Membrane Technology Applications in Mineral Processing

    By Rory Cameron, Chuck Edwards

    "Stringent environmental performance criteria and regulations, and the desire to minimize water use have made membrane-based treatment and separation processes an attractive option. This has lead to m

    Jan 1, 2012

  • CIM
    Modelling of Blast-Induced Stress Wave Propagation and Fracturing In Hard Rock Material

    By Ali Mortazavi

    In underground mining applications, successful blasting results in less damage, which may lower support costs, lower dilution and produce a uniform fragmentation. The explosive detonation process crea

    May 1, 2002

  • CIM
    Classification at the Sullivan Concentrator

    By G. J. Knighton

    Introduction The Sullivan concentrator treats the complex lead-zinc-iron ore from the Sullivan mine of the Consolidated Mining and Smelting Company of Canada, Limited, to make a lead and a zinc con

    Jan 1, 1947

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)

    By P. A. Witt

    "Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry

    Jan 1, 2005

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • CIM
    Mineralogical and Metallurgical Results at Peñoles´ Mining Operations - Mexico

    By Luis Magallanes-Hernández

    "Industrias Peñoles, S.A. de C.V. (Peñoles) in Mexico, is a major silver producer. The Peñoles Mining Division has eight Mining Operations and in seven of them, flotation is used to concentrate the me

    Jan 1, 2005

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Technology Options and Innovation for Copper Heap Leaching

    By Damian Connelly

    The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor

    Jan 1, 2019

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    25 Years of Process Development: Gold Processing

    By K. P. Wright

    "Twenty-five years ago, there were about thirty-two gold mines operating in Canada; nine of these have been in continuous operation since then and are still operating. Three of these are part of the D

    Jan 1, 1987

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • CIM
    Quality Assurance Programs for Fabrication of Specialised Vessels and Exotic Alloy Piping

    By M. Pearson, W. Bristowe, A. Hanson

    "There's no such thing as quality assurance; only quality control ... by inspection. "(1) A common misunderstanding in the procurement and construction of custom designed, fabricated pressure ves

    Jan 1, 2004

  • CIM
    Value Based Grinding Circuit Control

    By M. H. Moys, J. A. Finch, A. R. Laplante

    "A detailed review of ball milling circuit control practices in industry has been carried out. Based on fundamental process performance objectives, a standard system for base-level control of most bal

    Jan 1, 1988

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • CIM
    The Afton Concentrator

    By J. Lovering, M. Allan

    "INTRODUCTIONThe Afton Mines property is located 180 air miles east-northeast of Vancouver and nine miles west of Kamloops, a city of 60,000 people in south central British Columbia. The deposit is lo

    Jan 1, 1979

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008