The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)By W. Bullen
A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t
Jan 1, 2006
-
Spray Drying of Mineral ConcentratesBy R. J. MacLeod
"INTRODUCTIONThe removal of water or liquid from slurries and solutions is a procedure generally present in many process industries. This has prompted the development of many mechanical and thermal de
Jan 1, 1972
-
Comparative economics of bacterial oxidation and roasting as a pre-treatment step for gold recovery from an auriferous pyrite concentrateBy S. R. Gilbert, C. O. Bounds, R. R. Ice
"Many ores are upgraded to produce auriferous sulphide concentrates (principally pyrite) which are not amenable to direct cyanidation. Often these refractory gold-bearing concentrates contain undesira
Jan 1, 1988
-
Industry Scale Knowledge Management ? Riskgate and Australian Coal OperationsRISKGATE is an interactive online risk management system developed by the Minerals Industry Safety and Health Centre (MISHC; University of Queensland) to maximise health and safety performance in the
Aug 1, 2013
-
Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and MuscoviteBy Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas
"Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr
Jan 1, 2003
-
Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of FlamesBy Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien
"Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb
Jan 1, 2005
-
Was that Locked Cycle Test Any Good?By Mike Ounpuu
"Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo
Jan 1, 2001
-
The transition of mining methods at Anderson Lake MineBy Seppo Haapamaki
"Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i
Jan 1, 1988
-
Water Utilization by Oil Sands Mines in AlbertaBy Leslie F. Sawatsky
Raw water import requirements for oils sands mines depends mainly on factors such as ore processing rate, ore material characteristics, tailings processing technology, tailings storage systems, proces
May 1, 2004
-
Stratigraphy and structural analysis of the North Gold Zone at Montauban-les-mines, QuebecBy Jean-Marc Simard, Vincent Jourdain, Denis W. Roy
"Seven lithologic units, informally characterized, were recognized in the vicinity of the Montauban orebody. The first five lie in stratigraphic order. From structural bottom to structural top these a
Jan 1, 1987
-
Mineral resource + engineering, economic and legal feasibility = ore reserveBy M. Vallée
Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio
Jan 1, 2000
-
Requirements for Underground Mine Backfill MonitoringBy David O. DeGagné
While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year
May 1, 2001
-
The use of a geographic information system for open pit mine developmentBy U. Dillon, G. Blackwell
"Geographic information systems (GIS) provide an efficient means for the recording, manipulation, revision, display and analysis of spatially referenced data. GIS are widely used at the exploration st
Jan 1, 2003
-
Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold ClimatesBy T. R. Wildeman
"At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,
Jan 1, 1992
-
Research into high density backfill placement methods by the Ontario Division of Inco LimitedBy B. Goard
"IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between
Jan 1, 1987
-
Metals exploration in a changing industryBy R. Horn
The financial performance of the mining industry, measured by return on equity and capital employed, has been inadequate for many years. Consequently, mining companies are not valued highly by stock m
Jan 1, 2002
-
The G-9 Mine StoryOverview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min
May 1, 2010
-
Flotation Control Based on Froth Textural CharacteristicsBy Patrick Pelletier, Pierre-Alexandre Bossé, Julie Fournier, Gianni Bartolacci, Jayson Tessier, Ahmed Bouajila, Carl Duchesne
"This paper summarizes research into the study of the control of flotation processes based on froth images. The use of numerical image analysis techniques for the extraction of significant patterns (f
Jan 1, 2005
-
Production of High-Quality Electrorefined and Electrow on Copper at Inco?s Copper Cliff Copper RefineryBy A. S. Gendron
A brief description of Inco's ORC copper refinery tankhouse and the electrowinning tankhouse is followed by a comparison of the requirements for the production of the high-quality copper in both
Jan 1, 1977
-
Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problemsBy Stuart Elliot
Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over
Nov 1, 2011