Reducing maintenance costs through predictive fault detectionBy Y. Faitakis
In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.
Jan 1, 2004
-
Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)By Y. Faitakis, G. J. Powley, C. Mackenzie
"In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis
Jan 1, 2004
-
Development of an Iron Ore Concentrate Fines Recovery Process from Copper TailingsBy Lutz Markworth, Fernando Parra, Wolfram Jaspers
"The worldwide demand of iron ore and the depletion of the high-purity deposits make it necessary to recover ores in increasingly fine size fractions or low Fe content in the feed material. Impurities
Jan 1, 2008
-
The ACACIA Reactor Improving Gravity Recovery!By Ish Grewal
The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig
May 1, 2002
-
Adapting to Ore Characteristics at Lac des Iles MineBy Erin N. Legault-Seguin
The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000
May 1, 2009
-
Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
-
New Technologies for Improved Processing of Base and Precious Metals Containing OresBy J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio
"Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.
Jan 1, 2013
-
A Step back in time to Hand-Held Mining for ProfitabilityBy Mike Turner
The Otter-Juan mine was closed by WMC Resources? Kambalda Nickel Operations (WMC-KNO) in 1999 due to the combined effects of low Nickel prices and high mining costs. GBF Mining Pty Ltd purchased Otter
May 1, 2004
-
Latest Fire Protection Innovations for Large-Scale Mining EquipmentBy Don A. Toth
Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were
Apr 1, 2005
-
Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”By Robert E. McIvor
"“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g
Jan 1, 2013
-
Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.By Bruno Lemelin
Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther
May 1, 2004
-
El Mochito Mine – Latest Operational Improvements and Future Challenges in the Area of Mineral ProcessingBy Renaud Adams, Vladimir Salatic
"The El Mochito Mine located in Honduras, Central America, has produced lead, zinc and silver in concentrates since the 1950s. The paper discusses changes made in both lead and zinc circuits to reduce
Jan 1, 2007
-
Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)By Douglas M. Smith, G. A. Maki
"The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa
Jan 1, 1983
-
Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper ProjectBy S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton
"Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub
Jan 1, 2013
-
Evolving Equipment Health, a Rio Tinto Case StudyBy Daniel D. M. Adams
Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min
May 1, 2011
-
Preliminary Investigation of Rockmass Response to Undercut Blasting in a Block Cave Mining System Using VRSV"Block caving is the preferred underground mining method to profitably extract massive, low-grade orebodies; however, lack of cave access inhibits understanding the rockmass response to mining, which
Jan 1, 2016
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Automated Real-Time Elementary Analysis of Drill Dust using LIBS TechnologyBy Karl Nienhaus
The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo
Oct 1, 2009
-
Instrumentation of a Graphite Zone in the #3 Shaft at Brunswick MineThe #3 Shaft at Brunswick Mine, Bathurst, New Brunswick, Canada, intersects a soft graphite zone just below the 3400 Level. Ground movement within this zone causes the concrete liner of the shaft to b
May 1, 2009
-
An agent-based framework for open pit mine planningBy K. Awuah-Offei
Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in
Jan 1, 2008