Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Training our New Starters – Between a Rock and a Hard PlaceBy M Davis
Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested
Aug 22, 2011
-
An investigative study on the interfacial behaviour of waste graphite resource with liquid ironBy S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani
Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati
Jun 19, 2024
-
Comminution: Past Developments, Current Innovation and Future ChallengesComminution of solids is surely one of the oldest technologies which even in this day and age of DNAs, chips and space exploration continues to challenge our scientific acumen and engineering ingenuit
Jan 1, 1992
-
A Paradigm Shift in Underground Raisebore Reamer RemovalBy P Viljoen, A Holland, C Parken
In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a
Mar 15, 2021
-
New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith OperationsThe Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt
Jan 1, 2007
-
Long hole plug – addressing the hazard of bogged rods in ‘upholes’By G Noonan, S Thomas, M Limbert
Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of
Oct 16, 2017
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame ThemBy J Paradis, K Dudgeon, M Topping
At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon
Aug 18, 2014
-
Structural and Lithological Controls on the Location of Orebodies in the Baizhangzi Lode Gold Deposit in Western Liaoning Province, ChinaBy L Xiong, W J Shi, J H. Wei
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baizhangzi gold deposit is located in the northern North China Craton. The structural a
Mar 18, 2015
-
A Resume of the Results of Iron Ore Exploration in Western AustraliaThe results of iron ore exploration in Western Australia between '1961 and 1964 are outlined, with particular.reference to the Hamersley Iron Province. Exploration during: these three years has
Jan 1, 1964
-
Carrapateena project to date – Geotechnical risks and managementBy G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Computer Simulation Studies To Assist In Mine Equipment SelectionBy Harrison J
The correct selection of equipment to use in a mine is a problem which constantly faces the mining engineer. In some cases a wide choice of equipment with different operating characteristics is avai
Jan 1, 1987
-
Three Decades of Gold Production at the Newmont Tanami OperationsBy A Cranley, A Giblett, S Thacker
The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil
Sep 1, 2014
-
Increasing stope recovery in an underground gold mine by using effective analysis, corrective action and employee engagement processesBy R F. Cota, C Freeman, A Heberle
"The Lamego mine is an underground gold mine in the Iron Ore Quadrangle in Minas Gerais state, Brazil. The mine produces 48 to 50 koz per annum, as part of the larger Cuiabá-Lamego Complex. This combi
Oct 16, 2017
-
Application of Optimisation Technology to Resource Planning Within BHP Billiton Iron OreBy D Xu
BHP Billiton Iron Ore is one of the world’s premier suppliers of iron ore. It currently has operations in Western Australia and Brazil and also has some iron ore interests in West Africa.BHP Billiton’
Jul 11, 2011
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine ClosureBy A Hutton, C Dick, D Fletcher
Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks
Jul 10, 2012
-
Applied Mineralogy of the Suurikuusikko Refractory Gold Deposit, Northern FinlandBy J Leppinen, B Johanson, R Kalapudas, G McMahon
The Suurikuusikko gold deposit was discovered in 1987 in western Finnish Lapland, 54 km NNE from the town centre of KittilS in the volcanic belt of Central Lapland. It is hosted by tholeiitic basalts
Jan 1, 2008
-
Implementation of a management operating system at the Telfer Underground Gold MineBy M Franklin, C Puglisi, S Fitch
Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and
Mar 15, 2021
-
The Note on Further Consideration of Flooding and Hold-Up Phenomena in the BoshBy Warner RE
SINCE 1952, when Elliott et a/ first applied the Sherwood correlation for flooding in chemical absorption towers to blast furnaces numerous investigators throughout the world have followed their ex
Jan 1, 1975