Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Legume and Grass Revegetation of Mine Tailings

    By C P. C David, J P. T Domingo

    Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu

    Jul 16, 2014

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    After Blast Re-Entry Time for a Room and Pillar Operation

    By A Agasty, O Langefeld, MáKellner, E Clausen

    The lowering of the pollutant concentration limits at the workplace subjects the mining industry to higher requirements for dilution; this situation is worsened with the current discussions within the

    Jul 1, 2013

  • AUSIMM
    Evaluation of Grouted Thread Bar Bolt Performance by Means of Pull Out Test in Deep Ore Zone Mine PT Freeport Indonesia

    By L Rachmad

    Freeport IndonesiaÆs Deep Ore Zone (DOZ) mine is the new underground block caving mine within the East Ertsberg Skarn System (EESS) deposit which started production in mid-2000. The DOZ will produce 2

    Jan 1, 2002

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    What category cyclone is devastating your plant?

    By T G. Vizcarra, B Wong

    Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y

    Aug 29, 2018

  • AUSIMM
    Climate, safety leadership, and critical risk management in the Australian mining sector

    By A Fern, A Hawkes, o

    This presentation will cover: the importance of high-quality safety leadership; insights from a Safety Climate Survey that includes responses from 7903 employees working at 19 Australian mining organi

    Apr 16, 2024

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine

    By A K. Ghosh

    "Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an

    Nov 15, 2016

  • AUSIMM
    Inclined Troughed Belt Conveyor Systems for Underground Mass Mining Operations

    By A G. L Pratt

    Inclined troughed belt conveyors are more frequently being selected from a range of alternatives, which include shafts and trucks for ore haulage in underground mass mining projects. Belt conveyor hau

    Jan 1, 2008

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)

    By Wang J, Ma Y, Jia H

    The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t

    Jan 1, 1998

  • AUSIMM
    Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling Implications

    By G Haywood

    This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc

    Jan 1, 2002