Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recent Developments in Oil Exploration - New Zealand

    Much of New Zealand is comparatively young geologically in the sense that it has only recently been uplifted. In many places young marine sediments are to be found at high altitudes, as evidenced by t

    Jan 1, 1962

  • AUSIMM
    Application of the Backscattered Electron Microscopy Technique to Coal Petrography

    By Hamilton LH, Campbell PB

    Since fundamental research in applied coal petrography is carried out mostly on polished surfaces, backscattered electron microscopy is most applicable for studying coal in the SEM. By employing th

    Jan 1, 1989

  • AUSIMM
    Delayed Partial Melting of Subduction-Modified Magma Sources in Westerna Melanesia: New Results from the Late Cinozoic

    Many volcanoes in western Melanesia have tectonic settings and rock compositions that do not conform to conventional models of arc- trench systems. Part of the reason for this may be that in an env

    Jan 1, 1987

  • AUSIMM
    Stockton Mine Acid Rock Drainage Remediation û Part 1 - Passive Mitigation

    By J B. Holman, P A. Weber, P Lindsay

    Underground and opencast coal mining has occurred since 1896 on the Stockton Plateau, West Coast, New Zealand. Acid Rock Drainage (ARD) from historic and current mine workings has had an adverse envir

    Jan 1, 2007

  • AUSIMM
    The Calculation of the Fragmentation of Rock from Cratering

    The fragmentation of whole rock by blasting has an influence on the subsequent loading, hauling and crushing operations. However, no method of calculating the frag- mentation has yet been developed

    Jan 1, 1977

  • AUSIMM
    Bucket Wheel Excavators for Latrobe Valley

    The paper describes the development leading to the bucket wheel excavator systems now used in the Latrobe Valley and refers in particular to the new S.E.C.V. dredgers Nos. 14 and 15 which will be

    Jan 1, 1982

  • AUSIMM
    Mt Owen Mine Spotted-tailed Quoll Study

    By P York

    The study commenced in October 2012, to understand the basic ecology of the spotted-tailed quoll (Dasyurus maculatus) and to confirm whether the species utilise previously mined land on the Mt Owen mi

    Jul 16, 2014

  • AUSIMM
    The Directional Drill Monitor for Long Hole Gas Drainage in Coal Mines

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • AUSIMM
    A Test of Two Methods of Simulation of Regionalized Variables

    By Armstrong M

    Two methods of Monte-Carlo simulations, one suggested by Matheron (1972) and the other by Rudenno (1983), have been tested for simulating coal deposits. To do this 2160 values of ash percentages were

    Jan 1, 1985

  • AUSIMM
    An Outline of Blast Hole Diamond Drill Stoping at Mount Isa

    By McConachie W. J

    Introduction.Ore Bodies.Lead.Copper.Ground.Main Haulage Levels.Stope Preparation.Stoping Practice.General.Longitudinal Stopes-Ring Drilled.Parallel Hole Drilled.Transverse Stopes -Ring Drilled.Paralle

    Jan 1, 1953

  • AUSIMM
    Development of a Taxonomy for Indexing Web-Based Mining Safety and Health Research

    To solve the mining safety and health needs of the future, access to, and sharing of, timely and relevant information will be crucial. The next generation of the Web will provide tools (RDF, OWL, SPAR

    Jan 1, 2008

  • AUSIMM
    Sensitivity of a hydro-economic model in a mining region to changes in hydrological and economic inputs

    By N McIntyre, J Smart, J Ossa-Moreno, D Rivera

    Hydro-economics is a field of research that analyses water resources from a multi-disciplinary approach (Harou et al., 2009). These models generally include one component that describes the water reso

    Jul 25, 2018

  • AUSIMM
    An Integration of Short-Term Planning with Mineral Processing Simulation

    By F D Durao, Muge F. H, Rogado J. Q

    In the scope of the project named CAPUME II (EEC BRITE/EURAM contract - project MA2M-CT90,-0042(SMA)) for the development of an integrated mine planning system for underground mines, two of the main

    Jan 1, 1995

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    Prediction of Shearer Cutting Performance

    By Jeffrey IC

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer

    Jan 1, 1992

  • AUSIMM
    Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept

    By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie

    "Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass

    Jun 15, 2016

  • AUSIMM
    Pyrite Oxidation Rates Determined Based on Quantitative Mineralogy of Long-Term Column Leaching Tests

    By N DavT

    Pyritic tailings from the Quirke mine waste management area in Elliot Lake, Ontario were subjected to long-term column leaching experiments in two PVC columns measuring 122 cm in height and 15.2 cm in

    Jan 1, 2003

  • AUSIMM
    The Blue Asbestos Deposits of the Hamersley Ranges

    The Hemersley Ranges are located in the North West Division of Western Australia and extend, approximately, from latitudes 21¦ 30! to 23¦S and longitudes 117¦ to 120¦E. Their mean height above sea l

    Jan 1, 1964

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011