Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Seismicity of the Circum-Pacific and Seismic Risk: A Comparison with Volcanism

    About 74% of global seismic energy release occurs in the Circum-Pacific zone. Worldwide, about 71% of seismic energy release is in the form of shallow earthquakes, 27% as intermediate, and 2% as

    Jan 1, 1987

  • AUSIMM
    Planning of Air Cooling Systems in Mines and Tunnels

    By J Walasiak

    In the climate planning of mines and tunnelling with anticipated poor climatic conditions, and especially in case of longer working shifts, the main question is whether it can be reliably prevented th

    Jan 1, 2005

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic Approach

    By J S. Kuszmaul, T O. Aspinall

    The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin

    Jan 1, 1998

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnace

    By S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka

    The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of

    Jun 19, 2024

  • AUSIMM
    Joint Ventures - Taxation Risks and Advantages

    Both here and in Australia, the unique commercial and tax features of joint venture are finding favour in forestry, fishing, technology and infrastructure projects. For New Zealand mining companies, j

    Jan 1, 2005

  • AUSIMM
    A Technology of Precious Metals Recovery from Gold-Bismuth Ores

    By V P. Beskrovnaya

    Tests for the development of a metals recovery technology from samples of a Russian gold-bismuth deposit were carried out. Gold, silver and bismuth assay reported 5.6 g/t, 3.0 g/t and 0.08 per cent, r

    Jan 1, 2007

  • AUSIMM
    Improvements in Stoping Methods at Mount Isa Mines Limited

    By Mathews K. E, Willstead T. V C

    Initial glory holing was followed by sublevel stoping, with a small proportion of total production mined by shrink and cut-and-fill methods.The sublevel stoping method was successfully modified to cat

    Jan 1, 1961

  • AUSIMM
    Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project Management

    By A Radici, S Russell

    The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five

    Jan 1, 2009

  • AUSIMM
    Development in Cut and Fill Mining at ISA Mine

    By Jansen N

    Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire

    Jan 1, 1985

  • AUSIMM
    The McArthur River Project

    By Kareise G. J, Leung K

    The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead

    Jan 1, 1993

  • AUSIMM
    Mining Related Environmental Database for West Coast and Southland: Data Structure and Preliminary Geochemical Results

    By D Thomas

    Geochemical data related to AMD for the West Coast and Southland regions have been collated into a relational database and GIS system. The types of information include; rock geochemical data, water ch

    Jan 1, 2005

  • AUSIMM
    Effects of Shear on the Behaviour of Polymer-treated Slurries

    By D Reid, A Fourie

    The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti

    Jul 27, 2015

  • AUSIMM
    A Real-Time GPS kinematic-Positioning System for Automatic Mining Vehicle Guidance

    By Kubik K

    Recent significant advances in the Global Positioning System (GPS) have contributed to making real-time kinematic/dynamic process for decimetre to centimetre-level positioning more reliable and read

    Jan 1, 1997

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    The Development of a CADD Mine Design System

    By Gill L. F, Gleeson HB

    This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available

    Jan 1, 1989

  • AUSIMM
    Determination of the Optimal Direction of Mining Works Expansion in Open-Cut by the Volume Simulation Method

    By Bukeikhanov D. G, Syedin V. F, Sagyngaliyev K. S

    The present paper describes a method of simulating deposits of com- posite structure by means of computers. The method employs mathematical tech- niques to study the openworks zone formation dynamic

    Jan 1, 1977