Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Circulating Air Classification of Manufactured SandCirculating Air Classification of Manufactured Sand Due to environmental concerns, the supply and use of natural gravel has been limited by the Swedish government. The Swedish concrete industry is th
Sep 13, 2010
-
Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, AustriaBy Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin
PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973
Jan 1, 2005
-
RI 9345 - Burnout Control at the Albright Coal Waste Bank FireBy Robert F. Chaiken
Burnout Control is a process developed by the U.S. Bureau of Mines for accelerating the burning of wasted coal fires in situ, while at the same time controlling the heat and fumes produced. The Albrig
Jan 1, 1991
-
Mine Rehabilitation for Sustainable Landcare: Cost-Effective StrategiesBy R Simcock
Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve
Jan 1, 1997
-
Microwave Heating Principles And The Application To The Regeneration Of Granular Activated CarbonBy S. M. Bradshaw
The principles of microwave heating are discussed with reference to dielectric properties, heating phenomena and microwave equipment. Microwave regeneration of granular activated carbon for the carbon
Jan 1, 1998
-
Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event SimulationBy J. M. Simard, S. Morissette, P. Coursol, P. Mackey
A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is
Jan 1, 2009
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
RI 8772 Factors Affecting the Preparation of Misted Clay Feed and Solids-Liquid Separation After HCI LeachingBy R. S. Olsen
Although aluminum is easily leached from calcined clay with boiling mineral acids, the presence of fines and slimes in the leached residue has hindered the application of acid leaching processes. A fe
Jan 1, 1983
-
Correlation Between P-Wave Velocity And Some Mechanical Properties For Sedimentary Rocks ? SynopsisBy R. Altindag
Engineers and researchers need to estimate the mechanical properties of rocks from P-wave velocity. In previous studies, the researchers have investigated either the limited values or all the data bel
Jan 1, 2012
-
Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 SystemBy V. Prostakova, M. Shevchenko
The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental
Jan 1, 2019
-
Influence Of Urbanization And Geology On Deep Foundation Design And ConstructionBy Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Geophysics - Anaconda Exploration in the Bathhurst District of New Brunswick, CanadaBy C. G. Cheriton
The Bathurst mining district is located near the town of Bathurst on the north shore of the province of New Brunswick in eastern Canada. This region is the northeasterly extension of the Appalachian m
Jan 1, 1961
-
OFR-35-90 Permitting And Environmental Constraints - Their Impact On Mining In AlaskaBy Gary E. Sherman
This report presents a Bureau of Mines study on the cost of mine permitting and compliance with environmental regulations in Alaska. It discusses permitting requirements and procedures for placer and
Jan 1, 1991
-
Magnetic Anomalies of the Coromandel RegionBy D J. Woodward, A B. Christie, S A. Henrys
Low-level aeromagnetic data available in digital form have been combined to produce a new 1:100 000 scale map of total force anomalies of the Coromandel region, New Zealand. The map incorporates data
Jan 1, 2001
-
Building the Next Major Iron Ore Mine in the Labrador TroughCertain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu
May 1, 2011
-
The Influence of Composition on the Properties of Lead Part VIIIBy Orr C. W
Continuing the systematic investigation of the influence of elements on the properties of lead(1). If the effects of additions of copper (up to 0.3%) on Port Pirie lead have now been determined in so
Jan 1, 1938
-
An energy-based approach to blast designBy D. W. Taylor, I. W. Farmer, N. Mojtabai
Rittinger's and Bond's descriptions of rock crushing relate the energy input required to fracture rock and the surface energy required to form new fractures to the change in specific surface area of f
Jun 19, 1905
-
Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3DOne of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh
Nov 25, 2010
-
The Crushing and Conveying Operation at the Martha MineIn November 1999 Waihi Gold Mining Company commissioned its new crushing and conveying plant used to transport both ore and waste from the Martha Mine to its ore processing plant and also its tailings
Jan 1, 2001
-
RI 9635 - Self-Contained Self-Rescuer Field Evaluation: Fifth-Phase ResultsBy John P. Shubilla1, Nicholas Kyriazi
A joint effort by the Pittsburgh Research Center (PRC) and the Mine Safety and Health Administration (MSHA)3was undertaken to determine how well self-contained self-rescuers (SCSR's), deployed in
Jan 4, 1996