Search Documents

  • SME
    Designing Wetland Treatments Systems For Long Term Treatment Of Mine Drainage - An Impossible Dream?

    By Paul Eger

    The use of wetlands to treat mine drainage has become increasingly common, particularly as more information is available on their operation and construction. However, the lifetime of each system is s

    Jan 1, 2005

  • NIOSH
    OFR-26-80 Low Velocity Performance Of Anemometers

    By L. P. Purtell

    The performance of ten anemometers of several types has been measured at low air speeds. Multiple calibration runs provided sufficient data for measuring random error about the mean calibration curve

    Jan 1, 1979

  • SAIMM
    Increased Productivity Of Zinc Roasters And SO2 -Quality

    By Pekka Taskinen

    Advanced optimizing control of the fluidised bed zinc roaster has been in use for an extended period at Boliden Kokkola and the implications are seen as extended bed stability, increased throughput an

    Jan 1, 2008

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007

  • NIOSH
    RI 4721 A Study Of Certain Uncommon Minerals Found In The Pacific Northwest

    By A. J. Kauffman Jr.

    The Petrographic Section of the Bureau of Mines, Northwest Electrodevelopment Laboratory, Albany, Oreg., annually examines thousands of minerals and rocks. Samples are received from mining, engineers,

    Jan 1, 1950

  • SME
    Bleeder Entry Evaluation Using Condition Mapping and Numerical Modeling

    One of the most common critical areas of longwall mining in terms of ground stability are the gateroad and bleeder entries. These critical entries provide much-needed safe access for miners and allow

    Jan 7, 2020

  • CIM
    The Relations between Assarel-Medet JSC, Bulgaria, and the Municipality ?f Panagyurishte - A successful model for sustainable and socially responsible partnership

    By Lachezar Tsotsorkov

    Corporate social responsibility Is a principal trend of the corporate strategy for sustainable development of Assarel-Medet JSC ? the largest Bulgarian company for open pit mining and ore processing

    Aug 1, 2013

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • IIMP
    Minería responsable en zona de amortiguamiento de áreas naturales protegidas: caso de Poderosa en Parque Nacional Río Abiseo

    By José Calderón

    Poderosa tiene sus concesiones en las provincias de Pataz y Bolívar en la región La Libertad y son parte de la zona de amortiguamiento (ZA) del parque nacional Río Abiseo (PNRA) y de la zona de transi

    May 22, 2019

  • DFI
    A Historic Capitol And A Deep Excavation

    By Richard F. Sliwoski

    The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the

    Jan 1, 2006

  • SME
    Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBM

    By Martin Herrenknecht

    After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between

  • AIME
    Drilling – Equipment, Methods and Materials - Laboratory Studies of Formation Damage in Sands Con...

    By A. E. Anderson, H. J. Hilll

    Laboratory data for 155 field muds and 77 .shales have been used to develop correlations to estimate the net streaming potential component of the SP. Analysis of these data and comparison with field t

  • CIM
    Flotation of REE Bearing Minerals from Silicate and Carbonate Host Deposits

    By T. Deng

    Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga

    Jan 1, 2014

  • NIOSH
    OFR-39A-94-Vol. 1 Ergonomic Analysis Of Surface Taconite Maintenance Work - Final Report - Volume 1 ? Findings - Executive Summary

    The research described in this report was conducted under a cooperative research agreement between the U.S Bureau of Mines Twin Cities Research Center (TCRC), Cleveland-Cliffs Inc. (CCI), and three op

    Jan 1, 1994

  • NIOSH
    The Evolution Of Intelligent Coal Pillar Design: 1981-2006

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • NIOSH
    Bulletin 92 The Feldspars of the New England and North Appalachian States

    By A. S. Watts

    The Bureau of Mines has been conducting an investigation of the feldspar resources of the New England and North Appalachian States with a view to greater efficiency and economy in their utilization. S

    Jan 1, 1916

  • AUSIMM
    Integrated Mining and Metallurgical Planning and Operation

    By P L. McCarthy

    To design and operate a successful mine the technical specialists must agree on what is ore, what is not ore, and how quickly the orebody is to be mined and processed. These seemingly simple questions

    Sep 7, 2015

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994