Search Documents

  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986

  • NIOSH
    IC 8716 Bibliography Of Investment Costs, Operating Costs, And Related Economic Information For The Mineral Industries, January-December 1975 - Introduction

    By Joseph Sabatini

    This report, covering the period January through December 1975, contains abstracts of articles concerning all phases of cost engineering and economics for chemicals processing, raining, and other mine

    Jan 1, 1976

  • SME
    Technology News – Komatsu Truck Offers Many New Features

    Komatsu America has introduced its 2-MW (2,700-hp), 930E-3 ac electric drive truck with a 290-t(320-st) capacity. The truck is designed to provide increased productivity, lower cost per ton hauled and

    Jan 1, 2004

  • SME
    Alkali Methods for Alumina Extraction from the By‑products of High Alumina Coal: A Review - Mining, Metallurgy & Exploration (2023)

    By Jiayao Wang, Jian Chen, Leiting Shen, Hongyang Wang, Zeping Cao, Ziru Wang

    Large amounts of by-products, including coal gangue, circulating fluidized bed (CFB) slag, and coal fly ash (CFA), are generated during mining, washing and burning of high alumina coal (HAC). The stoc

    Aug 25, 2023

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME
    Performance Analysis Of Different Estimation Methods On Conditionally Simulated Deposits (0cbc8d79-eac1-4ce3-b58c-f46ab73f673b)

    By A. Arik

    An accurate estimation of mining block grades continues to be a challenging task for ore reserve practitioners. Two of the factors that affect the accuracy of the estimates are the estimation method u

    Jan 1, 2000

  • SME
    Mining on the Edge of the Murray Mine

    By Sam Ash

    The Murray Mine was one of the first mechanized cut-and-fill underground gold operations in northern Nevada. At the end of 2002, mine production began to decline. So the mine entered a phase of remnan

    Jan 1, 2006

  • ISEE
    The Influence of Damping on Computer Simulations of Rock Motion: Computer Modeling of Gas Flow and Gas Loading of Rock in a Bench Blasting Environment

    By Steven D. Knudsen, Dale S. Preece

    Computer modeling of the blasting process can aid in gaining an understanding of the physics controlling the process. The sequence of events in a blast occur so rapidly and in such a violent environme

    Jan 1, 1992

  • NIOSH
    IC 8709 Coal Mine Illumination - Proceedings: Bureau Of Mines Technology Transfer Seminars - Pittsburgh. Pa., November 4, 1975: St. Louis. Mo., November 6, 1975: and Denver, Colo., November 11, 1975

    Research personnel from the Bureau of Mines, representatives of the Mining Enforcement and Safety Administration (MESA), and members of the mining industry met with other Government and Industry repre

    Jan 1, 1976

  • SME
    Recreating a Headwater Stream System on a Head-of-Hollow Fill

    By C. T. Agouridis

    Head-of-hollow fills or valley fills have gained national attention due to increasing environmental concerns, particularly with regards to headwater stream loss. Researchers at the University of Kent

    Jan 1, 2008

  • SME
    Design And Construction Of Lake Mead Intake No. 3 Shafts And Tunnel

    By Jon Hurt

    INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3

  • IIMP
    Skills training in the australian mining industry with emphasis on safety and productivity outcomes

    By Phillip Martin Warren

    Safety and productivity are critical factors in the performance of the Australian Mining Industry. In this sense, the paper point out that while the multiple dimensions of both training and productivi

    Sep 13, 2001

  • IIMP
    Real productividad de los equipos de mina

    By Edgar Peña

    La efectividad de un equipo en la planta de la industria minera es importante en tanto se opere con eficiencia y efectividad. Empero, es necesario conocer el método de cálculo que se ha empleado para

    Sep 13, 2001

  • SAIMM
    Salient Issues In The Reporting Of Mineral Resources And Mineral Reserves In The Vein And Reef Mining

    By G Njowa

    Mineral resource evaluation and estimation process is not an exact science; however it depends on the knowledge and experience of the competent person and his ability to apply his mind, make reasonabl

    Jan 1, 2008

  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • SAIMM
    Structure Model And Properties Of Alkali Borate Melts

    By Z. Zhang, R. G. Reddy

    Experimental and thermodynamic modelling studies on the structure of alkali borate melts and properties are discussed. A thermodynamic structure model for alkali borate melts is developed to describe

    Jan 1, 2004

  • SAIMM
    Chemical And Physical Changes Of Cathode Carbon By Aluminium Electrolysis

    By J. Hop, A. Støre, T. Foosnæs

    The carbon cathode for aluminium electrolysis is also part of the container of the process. In order to understand the behaviour and possible failure of the cathode, detailed material properties under

    Jan 1, 2004

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • IIMP
    Biotechnological tools in bioleaching: implications for design and control processes

    By Patiño E

    Bioleaching is an established technology for the pre-treatment of refractory gold ores and concentrates and the leaching of whole ore copper heaps. In many cases, it offers economic, environmental and

    Sep 12, 2005

  • SAIMM
    Heavy minerals from Alberta’s oil sands—setting new standards?

    By Q. Lui, J. Oxenford

    The occurrence of heavy minerals in the oil sands of Alberta has long been known and has been well documented in the literature. Unfortunately most of the researchers working on this resource have bee

    Jan 1, 2003