Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    Relocating Mining?Induced Seismicity at the Trail Mountain Mine

    By Meagan S. Boltz

    From October 2000 to April 2001 a local array of fourteen seismograph stations was deployed at the Trail Mountain Mine (TMM), an underground coal mine in Emery County, Utah, to locate mining-induced s

    Jan 1, 2012

  • SME-ICGCM
    Impact Of Vertical Stress On Roadway Conditions At Dartbrook Mine

    By Ken Mills

    A program of stress change and roadway deformation monitoring was undertaken to measure the forward abutment load distribution about a retreating longwall panel at Dartbrook Mine. The results of this

    Jan 1, 2000

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Determination of the Strength of Powered Roof Supports According for Fatigue Life

    By Monika Patrycja Polak - Micewicz

    This paper presents an approach for estimating the fatigue life for the base of powered roof supports (shield) manufactured by the FAZOS roof support company. FAZOS?s powered roof supports are designe

    Jan 1, 2012

  • SME-ICGCM
    The research on the mechanical properties of hard roof in underground coal mining

    By Xu Lin Sheng

    During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th

    Jan 1, 1989

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner

    By Sanjay Kumar Singh

    The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas

    Jan 1, 2012

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    Applications of Microseismic Monitoring in China?s Underground Coal Mines

    By Xiangxi Wu

    Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of

    Jan 1, 2012

  • SME-ICGCM
    Overburden Subsidence Characteristics When Mining in Weak Rocks and Subject to Special Mining Conditions

    By Wenquan Zhang

    Based on the mining and geological conditions of Wadong Mine, Longkou City, Shandong Province, China, a viscoelastic model with proper creep parameters was established. The 3-D ANSYS was used to simul

    Jan 1, 2006

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal Mines

    By Michael Bayerl

    The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh

    Jan 1, 2009

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    German-Chinese Cooperation in the Field of Mining Subsidence Engineering

    By Axel Preusse

    Mining subsidence plays an increasing important role in the Chinese hard coal mining. Reasons for this are a substantial rise of production during the last decade, a dense settlement in many mining

    Jan 1, 2007

  • SME-ICGCM
    Theoretical analysis of breaking strength of mine pillars and test specimens

    By D. S. Choi

    This paper presents a theoretical analysis of the effect of shape and size on strength of geologic materials. The results indicate that the shape effect is caused by the development of confining press

    Jan 1, 1989