Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Influence Of Stream Valleys On Coal Mine Ground Control

    By John L. Hill

    Over 50 mines of the Appalachian and Illinois Basins are presently experiencing poor ground conditions believed to be caused by overlying stream valleys. The Bureau of Mines is conducting research int

    Jan 1, 1988

  • SME-ICGCM
    Effect Of Longwall Mining Subsidence On The Stability Of Surface Slopes

    By John J. Bowders

    The stability of surface slopes undergoing subsidence due to longwall mining was investigated to examine the effect the subsidence had on the stability of the slopes. Stability analyses were performed

    Jan 1, 1988

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    First Caving And Its Effects--A Case Study

    By S. M. Hsiung

    In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig

    Jan 1, 1984

  • SME-ICGCM
    Support of Coal Mines in the United Kingdom

    By James Arthur

    In deep coal mining the support of the underground roadway is fundamental and without knowledge of the mechanics of ground control a mine is unlikely to be operating safely and efficiently. It is the

    Jan 1, 2002

  • SME-ICGCM
    Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)

    By S. I. Al-Ameen

    Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes

    Jan 1, 1992

  • SME-ICGCM
    Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)

    By D. M. Shu

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur

    Jan 1, 1992

  • SME-ICGCM
    Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine

    By Yong-Ming Jiang

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Stability of Backfilled Cross-panel Entries During Longwall Mining

    By Brad Seymour

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines

    A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic

    Jan 1, 1988

  • SME-ICGCM
    Analysis And Field Testing Of Presupport Application In Coal Strata

    By J. D. Dizon

    Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat

    Jan 1, 1990

  • SME-ICGCM
    Full-face Pressure Monitoring in Medium-Weak Roof Condition

    By Syd S. Peng

    Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,

    Jan 1, 1997

  • SME-ICGCM
    Study On The High-Pressure Grouting Of The Overburden For Subsidence Control

    By W. J. Guo

    Overburden movement as a result of longwall mining can be classified into, in ascending order, caving zone, fractured zone, and bending zone. Operation experience and laboratory research have demonstr

    Jan 1, 1994

  • SME-ICGCM
    Design and Field Testing of a Mobile Roof Support for Retreat Mining,

    By Robert R. Thompson

    Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro

    Jan 1, 1986

  • SME-ICGCM
    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993