Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Overburden Strata Movement for the Longwall Mining of Shallow Seam under the Gobs of Room and Pillar Mining

    By Fangtian Wang

    The fully mechanized longwall mining was employed in a shallow coal seam that was under the gobs of room and pillar mining and overlain by thin bedrock and thick loose sands. Operational practices hav

    Jan 1, 2014

  • SME-ICGCM
    The Quasi-Protection-Layer Model and Its Mechanisms of Gas Drainage

    By Liu Xiao, Lin Xiaoying, Ma Geng, Tao Yunqi

    "The soft coal in China has several issues, low permeability, high gas content and prone to gas outburst, making it difficult to drill and improve its permeability. Using the rock mass loading test, t

    Jan 1, 2016

  • SME-ICGCM
    A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal

    By Dion Pastars

    Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the

    Jan 1, 2007

  • SME-ICGCM
    The Study on the Overlying Strata Movement Features and Development Characters of the "three Zones" in Ultra-Thick Coal Seams

    By Xuexin Ding, Weijie Wei, Jinwang Zhang, Yi Chen, Shengli Yang

    "Many ultra-thick coal seams exist in Xinjiang and the northern part of the Inner Mongolia. These coal seams are more than 30-40m thick. This kind of the thick coal seam is too difficult to extract in

    Jan 1, 2016

  • SME-ICGCM
    The Interaction of Unique Geology and Retreat Room?and?Pillar Mining on Overburden Barrier Performance at the Grove No. 1 Mine

    By Anthony T. Iannacchione

    This study, funded by the Appalachian Research Initiative for Environmental Science (ARIES), examines how mine layout, mining method, and geology interacted to allow water from the Grove No.1 mine poo

    Jan 1, 2013

  • SME-ICGCM
    Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping Seam

    By Yongping Wu

    Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The

    Jan 1, 2013

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    Inflatable Rock Bolt Bond Strength vs. Rock Mass Rating (RMR): A Comparative Analysis of Pull–Out Testing Data from Underground Mines in Nevada

    By Chase K. Barnard, Rahul Thareja, Sean Warren, Rajagopala Kallu

    "Inflatable rock bolts are commonly utilized for ground support in Nevada underground mines, however, there is limited information regarding what factors influence the bond strength of these bolts. Bo

    Jan 1, 2015

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • SME-ICGCM
    Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining Conditions

    By Ruixiang Gu

    The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie

    Jan 1, 2014

  • SME-ICGCM
    Progress in Managing the Geotechnical Aspects of Longwall Face Recovery

    By David Hill

    "End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra

    Jan 1, 2010

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    Ground Response to High Horizontal Stresses during Longwall Retreat and its Implication on Longwall Headgate Support

    By Peter Zhang, Daniel Su, Essie Esterhuizen, Mark Van Dyke, Berk Tulu, Dave Gearhart

    "Roof falls in longwall headgate can occur when weak roof and high horizontal stress are present. To prevent roof falls in the headgate under high horizontal stress, it is important to understand the

    Jan 1, 2018

  • SME-ICGCM
    Safety and Productivity Innovations in Mechanized Bolting

    By Gregory Hinshaw

    Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change

    Jan 1, 1998

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    The Broken Rock Zone Around Tunnels And Its Support Theory

    By Fangting Dong

    The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s

    Jan 1, 1988

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000