Haul-road monitoring in openpit mines using unmanned aerial vehicles: A case study at Bald Mountain Mine siteBy MATTHEW HART, THOMAS BAMFORD, Kamran Esmaeili, MICHAL KOWALCZYK, FILIP MEDINAC
Improved haul-road conditions can have a positive impact on mine operations, resulting in heightened safety, productivity gains, longer tire life and lower maintenance costs. For these reasons, a moni
-
Assessment Of Modeling Techniques For Prediction Of Subsidence Over Longwall AreasBy A. W. Khair
This paper presents an assessment of modeling techniques in predicting subsidence over longwall areas. Extensive instrumentation, both at the surface and subsurface of three longwall mines in northern
Jan 1, 1989
-
Tailings storage facilities (TSFs) dust control using biocompatible polymersBy Kwangmin Kim, Taehee Lee, Minkyu Kim, JUNHYEOK PARK
Mine tailings storage facilities (TSFs) can be a significant source of fine, respirable dust. About 25 percent of the mass fraction of tailings from a hard-rock mine consists of particles of a respira
-
Short-Term Planning In Sublevel Stoping Methods - IntroductionBy Fernando Muge
A complex pyrite orebody located in the South of Portugal (MO INHO) was exploited in the past by cut and fill methods until a certain level. It was decided to design a new plant for non ferrous met
Jan 1, 1979
-
The Itos Chloride Leach Plant For Silver - Two Years Into ProductionBy Daniel W. Kappes
In late 1995 at the Randol symposium in Squaw Valley, I gave a paper which described the Itos project flowsheet. At that time, project construction was nearly completed and stmtup was close. This pape
Jan 1, 1998
-
Carbon Sample Analyses As A Guide For Cip/cil Plant OptimizationBy A. H. Reitsema, Hans E. van Dam
In CIP, CIL, and Heap Leach gold recovery operations, a sub-optimal activated carbon performance invariably causes a significant loss of revenues. In this paper it is shown, how dedicated analyses of
Jan 1, 1995
-
Challenges, Solutions, And Reality In TBMS For The English Channel TunnelsBy John Turner, John A. Gibson, David Cass
Contents A. Introduction B. Description of Robbins Company involvement in several of the English Channel Tunnel projects C. Identification of project requirements and comparison of TBM featur
Jan 1, 1989
-
Progress in Computer Applications for Process Modeling, Simulation, and Control ? IntroductionBy H. R. Cooper
Refinements and increased sophistication in modeling and simulation, and introduction of advanced techniques in automatic control made feasible with digital processor handling of data, represent the m
Jan 1, 1989
-
Air Sparging Optimization For Remediation Of MTBE And TBA Contaminated SitesBy M. I. M. Darwish
In this paper, an effort was made to get more in-sight about the parameters that can affect air sparging technique optimization. Numerical simulations were used in predicting the effects of different
Jan 1, 2008
-
The Ultrasonic Technique For Monitoring Air Quantity Of A Mine FanBy Boshou Bian
Air quantity is the primary parameter governing the working condition of a mine fan. In order to improve the fan performance and efficiency, reduce its energy consumption, and guarantee mine safety, i
Jan 1, 1989
-
Methodology For Geotechnical Evaluation Of An Underground Powerhouse In Weak RockBy D. M. Cregger, J. L. Rosenblad, R. E. Ranken
The construction of a large span, high-walled underground opening in a low strength shale rock is unprecedented. The feasibility of constructing a pumped storage project with several tunnels and a lar
Jan 1, 1983
-
Using Mobile Roof Supports For Pillar Extraction at Martin County CoalBy K. F. Unrug
Martin County Coal Corp. is located in Martin County, KY, in the Appalachian coal fields, near the West Virginia border. The company's total leasehold covers more then 133.5 km' (33,000 acre
Jan 1, 1991
-
Review of electrical separation methods – Part 2: Practical considerationsBy K. Hanumantha Rao, K. S. E. Forssberg, H. R. Manouchehri
This paper summarizes the practical considerations of the various electrical separation methods used in mineral processing. The effective factors related to mineral characteristics and equipment attri
Jan 1, 2000
-
A Novel Method Of Raise Development At MolycorpBy J. P. Hedlund
Molycorp's gravity type panel-caving operation employs a system of short raises to transfer ore from the Grizzly Level to the Haulage Level. The raises have normally been developed using a conven
Jan 1, 1991
-
Rubber-Lined Balling Drums At United States Steel's Atlantic City Ore OperationsBy Russell L. Dahl
In a continuing effort to improve plant efficiency, United States Steel's Atlantic City Ore Operations completed the rubber lining of its balling drums in late 1982. This resulted in benefits of
Jan 1, 1983
-
Indium electrowinning from sulfate solutions: The influence of cathodic support on process effectivenessBy A. Dell’Era, E. Ciro, C. Lupi
The paper explores the recovery of indium via electrowinning from sulfate baths, focusing on the impact of different cathodic supports (AISI 316L and nickel) on process parameters such as electrolyte
Nov 1, 2023
-
Scaling Mine Pillar Size And Shape With The Psi FunctionBy L. A. Panek
A new pillar strength formula is presented. It incorporates a function [IF] of size and shape that takes into account the size-shape interaction effect as well as the enhanced strength exhibited by wi
Jan 1, 1995
-
Control of Blasting for Ore Blending and Autogenous Mill Performance at Hibbing Taconite Company- Preliminary FindingsBy Jack W. Eloranta, Michael J. T. Orobona, Peter R. VanDelinder
Ore blending for process optimization is becoming an increasing factor for managing cost and productivity. Economic mining and processing a very low value ore in an extremely competitive market result
Jan 1, 2004
-
Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan
The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J
Jun 13, 2023
-
Instrumentation Used To Control Excavation And Rock Bolting For Underground Subway StationBy Edward J. Zeigler, John T. Miller
INTRODUCTION Construction of Phase I, Section A, of the Baltimore Region Rapid Transit System required that six underground stations be built using a cut and cover excavation technique. For five of
Jan 1, 1981