Status Of Flywheel-Powered Shuttle Car DevelopmentBy D. Christofferson
As an alternative power source to eliminate trailing cables, ESD Corporation is installing a flywheel system on a shuttle car. Flywheel power is extracted by a high-speed generator, developed by Lear
Jan 1, 1981
-
Status Of Flywheel-Powered Shuttle Car Development (b8e74fcc-3efb-4127-b437-4690668b3b0a)By D. Christofferson
As an alternative power source to eliminate trailing cables, ESD Corporation is installing a flywheel system on a shuttle car. Flywheel power is extracted by a high-speed generator, developed by Lear
Jan 1, 1982
-
The Characteristics Of Mine Airstreams And Special Considerations For Mine MonitoringBy Jeffery L. Kohler
The characteristics of mine airstreams, such as their magnitude in the time and frequency domain and their spatial distribution, as defined by isovels, must be considered when making a measurement. Th
Jan 1, 1987
-
Characteristic Curves For The Series-Parallel Ventilation Network With Multiple FansBy Y. J. Wang
The concept of subsystem characteristic curves for multiple-fan ventilation networks is presented through the construction of characteristic curves for two-fan, series-parallel networks. By considerin
Jan 1, 1994
-
Composting Of Local Organic By-Products For Quarry Reclamation In MilosBy K. E. Lasaridi
Increasing soil organic matter was considered to be an important factor for the establishment of vegetative cover in abandoned quarries of perlite and bentonite in the island of Milos. For this reason
Jan 1, 2002
-
A Hydrometallurgical Process For Beryllium Recovery From Spors Mountain Ores, UtahBy James K. Grunig, Rodney J. Anderson
A process consisting of leach, continuous countercurrent decantation, resin-in-column ion exchange, evaporative crystallization of beryllium sulfate, and decomposition of the sulfate was developed for
Jan 1, 1983
-
From Limestone To Lime: A New Concept In Gas ScrubbingBy Clifford J. Lewis
The role of calcareous minerals in that area of the environmental improvement program involving the control or elimination of sulfur oxide emissions is discussed, and a new concept in gas scrubbing, r
Jan 1, 1974
-
Technical Parameterization of Reserves for Open Pit Design and Mine PlanningBy Thierry Coléou
In this paper, we consider open pit optimization. At present, most methods specify the economic parameters and then find the corresponding optimal pit. But as the economic environment varies (which
Jan 1, 1989
-
A Feasibility Study Of Exploration For Deep-Seated Sulphide Ore BodiesBy Kerstin Malmqvist
Simulation technique has been used for a feasibility study of a deep exploration project for massive, sulphides in an old mining district, the Skellefte field. An interactive computerized mathemati
Jan 1, 1979
-
Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat ExchangersBy W. Zitz
Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t
Jan 1, 2011
-
A Knowledge-Based System For Hydraulic Maintenance Of A Continuous MinerBy Julie Mitchell
The U.S. Bureau of Mines is conducting research on the application of expert sys tens technology to mining equipment diagnostics and predictive maintenance, to increase mining productivity and efficie
Jan 1, 1989
-
Methods for assessing effects of longwall mining on surf ace subsidenceBy G. A. Hazen, S. M. Sargand
This study monitored longwall mining subsidence profiles over three panels that were mined beneath state highways in southeastern Ohio. The average maximum subsidence was 1.07 m (3.5 ft). The average
Jan 1, 1987
-
Yield Pillar Simulation Using Physical ModelingBy Dwayne C. Kicker, Duk-Won Park
As the use of longwall mining increases in the U.S.. there is a need to better understand the stress redistribu- tions indicative of this method. To control high stress concentrations, the yield pilla
Jan 1, 1986
-
Atlantic Avenue IRT Station Rehabilitation and Passageway ReconstructionBy Louis G. Silano, Aram Grigoryan
Parsons Brinckerhoff is providing engineering services for the Atlantic Avenue Station Complex Rehabilitation and Passageway Reconstruction for New York City Transit. Project reflects current real
Jan 1, 2003
-
Novel Approach For Enriching Nickel Content In Lean Lateritic Chromite OverburdenBy S. R. S. Sastri, G. V. Rao
Because the nickel contained in lateritic nickel ores does not occur in an identifiable mineral, it is generally accepted that these ores are not amenable to beneficiation. For this reason, such ores
Jan 1, 1997
-
Geostatistical Analysis for Evaluating Spatial Dependence in Fracture Set Characteristics ? IntroductionBy Stanley M. Miller
Analysis of discontinuous rock masses for engineering design purposes requires information about fracture characteristics. For such studies, fractures or other elements of the rock fabric (bedding, fo
Jan 1, 1979
-
Basic Principles And Concepts Of Practical Shallow Seismic Reflection ProfilingBy R. D. Miller, D. W. Steeples
Seismic reflection is a powerful geophysical exploration method that has been in widespread use in the petroleum industry for more than 60 years. This paper addresses some basic principles of the meth
Jan 1, 1994
-
Agglomeration: Cheap insurance for good recoverywhen heap leaching gold and silveroresBy P. D. Chamberlain
Agglomeration for the heap leaching of gold and silver ores is the process of attaching fine ore particles-less than 150 µm (100 mesh)-to coarser particles. The fines are thus immobilized and uniforml
Jan 12, 1986
-
Study Of Geometrical Properties Of Blocks In A Jointed Rock Mass Using Statistical GeometryBy Violetta Pavlova
Knowledge of geometrical properties of blocks in a hard jointed rock among other things is of considerable importance for prediction of rock mass behavior and for its exploitation. This paper presents
Jan 1, 1992
-
Open Pit Production Planning Through Pit-Generation And Pit-SequencingBy H. Sevim
The logic and capabilities of a long-term production planning method for open pit mining are presented. This is a new method that can be used to obtain simultaneous solutions to the four interrelated
Jan 1, 1994