Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Easy Areas for Improvement and Good Ideas I've Seen When Reviewing Plant Operations-From a Prominent Consultant in Industrial MineralsBy A. Frank Alsobrook
DOUG HALBE: Thanks, Terry. And in spite of your introductory comments, I'm going to attempt to continue our hallowed tradition of saying nice things about the speakers. This is really a serious c
Jan 1, 1998
-
Biological Sulfate Removal – A Case Study from Sierrita Pilot Plant Operations.By B. Waterman, R. Collins, V. R. K. Paruchuri, P. Gonzalez, H. Dijkman
"INTRODUCTION Mining and processing of sulfide ore bodies has the potential to solubilize sulfate. Gypsum in the host rock, as well as oxidation of sulfides during milling and processing can solubiliz
Jan 1, 2016
-
Bentonite And Specialty Sand Deposits In The Bidahochi Formation, Apache County ArizonaBy Ted H. Eyde
Specialty sand and bentonite are produced in the plateau province from the Bidahochi Formation near Sanders, Apache County, Arizona. It appears that deposits of both sand and bentonite formed during t
Jan 1, 1987
-
18. Discovery of the Ertsberg East Copper-Gold Deposit, Irian Jaya, IndonesiaBy Douglas R. Cook
The Ertsberg East discovery was announced by Freeport in 1979 with proven geological reserves of 45 Mt (49.6 million tons) with a grade of 2.65% copper and recoverable gold values. This recently disco
Jan 1, 1991
-
Geology And Gold Exploration In Western TurkeyBy L. T. Larson
Had the blank on the Abstract form been sufficiently spacious a more appropriate title for this paper would be: Neogene Tectonism, Magmatic Activity and Hydrothermal Precious Metal Mineralization in A
Jan 1, 1989
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Metals Industry Capacity- - An Overview and Reader's GuideBy John A. Cordes, Thomas F. Torries
INTRODUCTION Nonfuel mineral markets have always tended to be volatile due to the cyclical nature of demand and the difficulty of fine-tuning capacity and output levels. Experiences over the past
Jan 1, 1989
-
The Effect Of Feed Source In The Hot Water Processing Of Utah Tar SandBy M. Misra
The processing strategy for the effective separation of bitumen from low grade (< 10 weight percent bitumen) Utah tar sands by a hot water process differs significantly from that used for the processi
Jan 1, 1979
-
Mining’s Comeback is Slow and Uneven, But There is ImprovementIntroduction The US mineral industry in 1983 participated in the recovery from the recent recession. Compared with 1982, the value of raw nonfuel mineral output rose 8% to $21.2 billion. The $218
Jan 5, 1984
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
Managing Engineering Talent; Challenges to Optimize the Best and BrightestBy T. W. Camm, J. C. Johnson, S. D. Rosenthal
"Most engineers are bright, hard-working, reliable and prefer to avoid conflict. An engineering curriculum tends to self-select these characteristics. By most standards, you would expect workers exhib
Jan 1, 2018
-
Development of steel-fiber-reinforced concrete cribs to replace wood cribs in underground coal minesBy E. R. Bollinger, N. S. Tanious, R. D. Beckett
The US Bureau of Mines developed hand-made, steel-fiber-reinforced concrete (SFC) blocks for building mine cribs. To ensure wider usage of these cribs, US Steel Mining Co. initiated a joint developmen
Jan 1, 1987
-
Discussion - Alkali-Silica Reactivity: Mechanisms And Management - Mining Engineering, Vol. 48, No. 12, December 1996, PP. 61-64 – Leming, M. L.By B. Mather
Discussion by B. Mather I was very glad to see an article on alkali-silica reactivity of concrete aggregate in Mining Engineering. It is a topic that should be reexamined every 45 or 50 years. The la
Jan 1, 1998
-
Computational Fluid Dynamics Modeling Of A Methane Gas Explosion In A Full-scale, Underground Longwall Coal MineBy CLAIRE STREBINGER, ADITYA JUGANDA, JURGEN F. BRUNE, GREGORY E. BOGIN JR.
Methane gas explosions are a major risk in underground coal mining operations. The severity of such explosions can range from local area damage to massive loss of miners’ lives along with significant
Aug 1, 2022
-
Column Flotation For Fine Coal Recovery In India - A Techno Economic AssessmentBy K. P. Madhusudhanan, R. K. Bhatia, K. S. Narasimhan, R. N. Singh
A typical case study of a coal washery of capacity 500 t/h raw coal input has been presented and discussed with particular reference to the techno-economics for flotation column vis-a-vis the conventi
Jan 1, 1988
-
The allocation of differing site condition riskBy Zachary D. Jones
"Construction projects involve a great many risks. The risk that material prices will increase during construction or that the work under construction will be destroyed by fire, storm or some other ac
Jan 1, 2014
-
Part 5: Preparation Plant FlowsheetsBy Richard B. Muter
In determining the layout or combination of unit operations to be utilized in a modem preparation plant, several factors must be taken into account. Among these are the washability data, size consist
Jan 1, 1991
-
Subsidence of bedrock above abandoned coal mines in Illinois produces few fracturesBy R. A. Bauer
Investigations of bedrock within subsided areas over abandoned coal mines in Illinois reveal very little disturbance of the bedrock. In areas that have surface subsidence of 0.3 to 1 m (1 to 3.25 ft),
Jan 1, 1987
-
An Integrated Bioreactor System For The Treatment Of Cyanide, Metals, And Nitrates In Mine Process WaterBy R. Hiebert, M. Foote, S. Nordwick, M. Canty
An innovative biological treatment system designed to detoxify cyanide and nitrate and immobilize metals from cyanide leach operations is described. A pilot-plant demonstration was conducted to detox
Jan 1, 1999
-
A Laboratory and Pilot Plant Program for the Development of a Solvent Extraction ProcessBy Geoff W. Seward, Charles J. Maes
INTRODUCTION The work of the metallurgical engineer engaged in developing a leach, solvent extraction electro- winning process usually begins in the laboratory and generally proceeds via pilot pla
Jan 1, 1986