Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active mining

    By S. J. Schatzel

    In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO

    Jan 1, 2009

  • SME
    Technology News – Field Device Manager Improves Process Automation

    Invensys’ recently introduced Field Device Manager for Foxboro I/A Series distributed control systems provides the industry’s first solution that takes advantage of both the latest Enhanced Electronic

    Jan 1, 2007

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • SME
    State-of-Art Grouting Remedy for Ground Improvement

    By Faruk Oksuz, Cary Hirner, William A. Rochford

    Grouting is a frequently utilized remedy in the planning and implementation of ground improvement and tunnel rehabilitation practice. The state-of-art grouting application used for Chicago’s McCook Re

    Jan 1, 2005

  • SME
    An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage Fragments

    By John F. Gamble

    Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes

    Jan 1, 2007

  • SME
    H3PO4 Production Process Utilizing Phosphatic Clay as Feed Material Mining, Metallurgy and Exploration (96f76f16-6e96-43f6-a430-5734ccdc3912)

    By Jack S. Watson, Rasika Nimkar, Robert M. Counce, Matthew Gordy, Patrick Zhang

    Waste phosphatic clay presents a difficult disposal problem and a significant loss of P2O5. Recent developments make this study on the use of phosphatic clay as a feed material for H3PO4 production wo

  • SME
    Engineering Work Leading To A Rock Tunnel Plan

    By Forrest C. Neil, Clint J. Keifer

    The pollution of our water supply, Lake Michigan, is a continuing threat so long as our overflows from combined sewers exist. The problems have become even more acute during recent years, due to the i

    Jan 1, 1997

  • SME
    Roof And Rib Hazard Assessment For Underground Stone Mines – Preprint 97-113

    By L. J. Prosser, A. T. Iannacchione

    Unfortunately from 1991 through 1995, 44 miners were fatally injured in the stone industry. Of these 12 occurred at underground mines from a total work force of less than 2,000 miners. Nine of these 1

    Feb 24, 1997

  • SME
    The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery Relationship

    By J-P Franzidis

    A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu

    Jan 1, 2000

  • SME
    Modeling For Real-Time Performance Measurement: A Strategic Approach

    By Russell Barr, Robert E. Cook

    As most mining companies are taking advantage of the high market prices for base metals such as steel, copper and zinc, numerous challenges still face them. While demand is strong from countries like

    Jan 1, 2007

  • SME
    Banquet, Train Ride Highlight Hall of Fame Weekend

    By Tim O’Neil

    Dressed in black tie and Victorian attire, some 200 people came to Leadville, CO, for a September weekend featuring a National Mining Hall of Fame and Museum (NMHF&M) induction banquet and a scenic mo

    Jan 1, 2005

  • SME
    Pebble Project Moves Forward After Election Victory

    In Alaska?s southwest corner, in the Bristol Bay region, 476 holes have been drilled to help define the size of the Pebble Project. The results indicate that the deposit holds close to 32 Mt (72 billi

    Jan 1, 2009

  • SME
    Special Report : Consultants Streamline, Sell More When Work is Harder to Find

    By Hans W. Schreiber

    Most geologic and mining engineering consulting firms* began to experience the recession with declining billing levels, number of inquiries, and proposal requests in late 1981 or early 1982. As of tod

    Jan 2, 1983

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • SME
    Exploration Decision Analyses for the Brightwater Tunnels

    By L. Maday, V. J. Perrone, M. B. Gilbert

    INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen

    Jan 1, 2005

  • SME
    Simulation Of The Industrial Separation Of Rare Earth Elements By Solvent Extraction

    By C. Bazin

    The separation of rare earth elements is a complex process that is industrially carried out using liquid/liquid extraction. Detailed flow sheets of solvent extraction plants for the separation of rar

    Feb 27, 2013

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall Mine

    By Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay

    "Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o

    Jan 1, 2019