Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • SME
    Instantaneous Access To Maintenance Data

    By R. Gilges

    The implementation of effective techniques for meeting the maintenance requirements of the new Utah Copper Division smelter, one of the largest in the Western Hemisphere, is a goal of the smelter mana

    Jan 1, 1977

  • SME
    Figure 1: Respondents by Sector

    "The profile of the respondents was that of a professional responsible for communications, community relations or corporate social responsibility programs. By targeting a consistent professional profi

    Jan 1, 2011

  • SME
    Reaction Kinetics Of Ferrous Regeneration For Alternate Anode Reaction Technology

    By E. A. Sarver

    The Fe(II) regeneration process is an important aspect of Alternate Anode Reaction Technology (AART) for copper electrowinning (EW). In AART, Fe(II) is oxidized to Fe(III) at the anode during EW, and

    Jan 1, 2007

  • SME
    The Evolution Of Coke Plant Design - Today - Tomorrow

    By Peter Riba

    Up until ten years ago the industry had arrived at a relatively conventional, and consistent design of coke ovens. Through the years the designers and builders were not being heavily taxed to come up

    Jan 1, 1980

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013

  • SME
    Recovery Of Gold And Silver From Oxidation Leach Residues By Ammoniacal Thiosulphate Leaching

    By R. M. G. S. Berezowsky

    An atmospheric ammoniacal thiosulphate leach system was developed to recover gold and silver from residues of the ammoniacal oxidation leaching of sulphidic copper concentrates. Extractions of 88 - 95

    Jan 1, 1979

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • SME
    Coal Review

    By F. Freme

    Coal production in the United States in 2007 totaled 1.03 Gt (1,145.6 million st), according to preliminary data from the Energy Information Administration (EIA) (Ta-ble 1). This is a decrease of 1.5

    Jan 1, 2008

  • SME
    Materials Evaluation For Raw Mix Design In The Cement Industry: Case Studies And Applications For Sedimentary Deposits

    By G. Delagrammatikas, M. Karmis, J. Mastoris

    The evaluation of raw materials in terms of quality profile, mineralogical character and mechanical properties is of great importance to the cement industry. The variability of their chemistry and str

    Jan 1, 2002

  • SME
    A Survey Of Mine Ventilation Practices ? Introduction

    By Pierre Mousset-Jones

    A questionnaire was sent out to three classes of mines to determine the extent of the heat problem in U.S. and Foreign underground mines. The following list shows the replies received from this questi

    Jan 1, 1986

  • SME
    Slope Steepening Investigations for the Valley Pit at the Teck Highland Valley Copper Mine Using Presplit Blasting

    By Nick Rose, Mathieu Veillette, Matthew King

    "The Teck Highland Valley copper (THVC) mine is located approximately 55 km (34 miles) southwest of Kamloops and approximately 20 km (12 miles) west of Logan Lake, BC, Canada (Fig. 1). Mining at THVC

    Apr 1, 2019

  • SME
    Heap Leach solution management at Coeur-Rochester

    By Peter A. Anderson

    Innovative solution management is being used at Coeur-Rochester Inc. to increase bullion production and decrease overall costs. New operating programs call for reduced solution application rates to th

    Jan 1, 1989

  • SME
    The Technology And Workforce Of Manufacturing And The Metals Industry In Post-Industrial America - Introduction

    By Dennis A. Swyt

    In current post-industrial America, U.S. manufacturing is undergoing major changes both in the technology of its production and in the size and composition of its workforce. At the same time that comp

    Jan 1, 1989

  • SME
    Improvement Of Thiosulphate Stability In Gold Leaching

    By G. Deschenes, W. Yen

    Ammonium thiosulphate is a non-cyanide lixiviant for gold leaching. The major problem is the high reagent consumption. A combination of 0.3M (NH4)2S2O3, 0.03M CuSO4, 3M NH3 was used to leach a copper-

    Jan 1, 2002

  • SME
    Installation of a Ventilation Shaft at San Juan Coal

    By T. Arthur Palm, Stephen L. Bessinger

    San Juan Coal Co. (SJCC) operates an underground coal mine near Farmington, NM. Continuous miners and a longwall produce 6.3 to 7.2 Mt/a (7 million to 8 million stpy). SJCC is owned and operated by

    Jan 1, 2007

  • SME
    Mining and Hydraulic Transport of Minerals from Deep-Ocean Floor

    By H. Savasci, G. Yarim, J. S. Chung

    As part of ongoing deep-ocean mining research, hydraulic transport systems as well as status of deep-ocean mining systems are reviewed in the aspects of manganese nodules and crusts from 8006,000-m de

    Jan 1, 1999

  • SME
    Particle Size Monitoring Improves Grind and Aids Throughput at Golden Sunlight Mines

    By G. B. Amicucci

    Golden Sunlight Mines Inc. operates an open-pit gold mine and cyanidation plant about 11km (7 miles) northeast of Whitehall, MT. Golden Sunlight is a subsidiary of Placer Dome US Inc. Mining is acc

    Jan 1, 1991

  • SME
    Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, Colombia

    The La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio

    Feb 27, 2013

  • SME
    Analysis And Modeling Of Longwall Face-To-Face Transfers

    By C. Patrick

    Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer

    Jan 1, 1993