Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Rock Socketed Drilled Shafts for the Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of

    Jan 1, 2016

  • DFI
    Using Pile Reinforcement To Mitigate Multimodal Slope Failures: A 3D Lem Case Study

    By Javankhoshdel Yacoub

    Piles are often used to reinforce slopes as they increase the available restoring force when calculating the factor of safety against sliding. In this paper, a 3D model of a slope containing multiple

    Oct 1, 2022

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • DFI
    Comparison of Drilled Shaft Structural Response from Strain Gage and Shape Accel Array (SAA) Data

    By J. Erik Loehr, Minh Uong, Andrew Z. Boeckmann, Sarah G. Myers

    "The University of Missouri performed a lateral load test program involving 32 drilled shaft load tests for the Missouri Department of Transportation (MoDOT). Tests were performed at two MoDOT geotech

    Jan 1, 2017

  • DFI
    A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface Construction

    By Julie Clarke

    In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe

    Jan 1, 2009

  • DFI
    Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building

    By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi

    "The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States

    Jan 1, 2005

  • DFI
    A Geotechnical Instrumentation Case Study

    By Mehih Demirkan, Kevin Tehansky

    Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat

    Apr 1, 2023

  • DFI
    Installation Checklist For Driving Mega Piles

    By Douglas L. Scaggs

    Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry

    Jan 1, 2013

  • DFI
    Laboratory Mixing and Testing for Controlled Waste Disposal Site

    By Tomohiro Yamasaki

    "At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand

    Jan 1, 2015

  • DFI
    A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In Kolkata

    By Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin

    This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1

    Sep 1, 2022

  • DFI
    Friction Loss in Tieback Anchors used for Landslide Stabilization

    By John P. Turner, Benjamin J. Turner

    "Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho

    Jan 1, 2017

  • DFI
    Atlantic Wharf: Redevelopment Of A Historic Site On Boston's Waterfront

    By Lee S. Vanzler

    Atlantic Wharf involved the construction of a six-level underground parking garage and a 32-story high rise tower along the historic Boston Harbor waterfront. The site, historically known as ?Russia W

    Jan 1, 2011

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    Jan 1, 2013

  • DFI
    Design of Pile Foundation for Tall Railway Bridges in North-East India

    By Sumantra Sengupta

    "Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu

    Jan 1, 2015

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • DFI
    DFI Mission Executed Through Growth of Micropile Technology

    By Jim Bruce, Peggy Hagerty Duffy, Mary Ellen Large, Allen Cadden

    "Over the past 40 years, Deep Foundations Institute (DFI) has executed its mission “to bring together multi-disciplined individuals and organizations to find common ground and create a shared vision a

    Jan 1, 2017

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to Inundation

    By Adel M. Hanna, Ibrahim M. Mashhour

    "Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou

    Jan 1, 2015

  • DFI
    Flood Protection System for Infrastructures: Methodology and Instrumentation Testing

    By Gisele R. Passalacqua, Taylor Malangone, Subhash Mahali

    New York City is a busy metropolis with 8 million people. New York has the largest public transportation system with 6 million riders a day throughout the subway system. Keeping this infrastructure in

    Sep 8, 2021