Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Non Linear Fractal Model for the Analysis of Pile FoundationsBy Paola Campana, Maurizio Lenzi
"In the paper a non linear model for the analysis of the pile response to the axial loads is presented. The study aims to find a general analytical solution concerning the pile-soil interaction modele
Jan 1, 2017
-
Author indexAbouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber
Jan 1, 1994
-
Monitoring Auger Cast In Place Pile Construction And Testing In Hard ClayBy C. Vipulanandan
Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing
-
Low Overhead Secant Piles Drilled From Within A ShaftBy Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In ChinaBy Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
The Use of Rigid Inclusions to Support Large SpansBy Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic
Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr
Jan 1, 2019
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In VirginiaBy Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed
Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element ModellingBy Vijaya R, Boominathan A
The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p
Sep 1, 2022
-
Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case StudyBy Aditya Ayithi, William G. Ryan, Dean Herbst
"For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o
Jan 1, 2016
-
Analysis of Laterally Loaded Free-Head Pile Groups in SandBy Ashraf M. Eid
Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall
Jan 1, 2005
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged ToesBy Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Performance Monitoring for Deep ExcavationsBy Alexi J. Neill
"This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris
Jan 1, 2016
-
AUT-CPT & Pile Database for Piling Performance Using CPT and CPTU RecordsBy Sara Moshfeghi, Seyyed Majdeddin Mir Mohammad Hosseini, Abolfazl Eslami
"Due to variety of current pile bearing capacity methods based on the cone penetration test (CPT), for optimum design, it is necessary to evaluate the performance of such methods in different geotechn
Jan 1, 2017
-
Allowable Compressive Design Stresses For Pressure-Treated Round Timber Foundation Piling - Presented Before The American Wood-Preservers' Association Reno, Nevada, May 1985By James S. Graham
Research at the University of Colorado on southern pine and Douglas-fir piling has determined that the existing building code design stress values of 1200 psi and 1250 psi, as determined by ASTM D-289
Jan 1, 1986
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022